groundranger
Active · latest filing Aug 2026Residential

2919 Thousand Oaks Dr

Austin, TX 78746

2919 Thousand Oaks Dr: central heating and air replacement

A City of Austin permit filed August 26, 2026, indicates replacement of the complete existing central heating and air system, with or without ductwork, at 2919 Thousand Oaks Dr. A separate electrical permit for EVSE installation was filed February 7, 2025, and is marked final.

Summarized from City of Austin records · updated Aug 26, 2026

Projects
2
2 filings
Latest filing
Aug 26, 2026
since Feb 7, 2025
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedAug 18, 2026
  2. IssuedAug 26, 2026
  3. WorkAug '26 – Feb '27
  4. Final inspection
47% through of the permit windowAug 26, 2026 → Feb 22, 2027

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install evse

    Install evse

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2919 Thousand Oaks Dr

What is happening at 2919 Thousand Oaks Dr in Austin?

A City of Austin permit indicates replacement of the complete existing central heating and air system, with or without ductwork. The permit, 2026-107620 MP, was filed August 26, 2026, and is active.

Is a new home being built at 2919 Thousand Oaks Dr?

The listed permits do not indicate new home construction. They indicate a central heating and air system replacement and a separate EVSE installation.

When was the HVAC permit filed at 2919 Thousand Oaks Dr?

The City of Austin filed mechanical permit 2026-107620 MP on August 26, 2026. Its status is active.

What does permit 2026-107620 MP cover?

It covers replacement of the complete existing central heat and air system, with or without ductwork, at 2919 Thousand Oaks Dr. The permit is listed as active.

Was an EV charger installation permitted at 2919 Thousand Oaks Dr?

A City of Austin electrical permit for EVSE installation was filed February 7, 2025. Permit 2025-012010 EP is marked final.

Also being built nearby

All of 78746
Email me when it passes final inspection