groundranger
Recent · latest filing Jun 2026Residential

3119 Eanes Cir

Austin, TX 78746

EV charger installation permitted at 3119 Eanes Cir

An electrical permit covers a dedicated 60-amp circuit and a ChargePoint EV charger at the residence. The City of Austin permit was filed June 26, 2026, and is marked final.

Summarized from City of Austin records · updated Jun 26, 2026

Projects
1
1 filings
Latest filing
Jun 26, 2026
since Jun 26, 2026
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Install dedicated 60 amp ev circuit from outdoor main breaker to garage; install chargepoint ev charger with built in gfci protection; install surge protection on outdoor main breaker panel

    Install dedicated 60 amp ev circuit from outdoor main breaker to garage; install chargepoint ev charger with built in gfci protection; install surge protection on outdoor main breaker panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 3119 Eanes Cir

What is being installed at 3119 Eanes Cir?

The permit covers a dedicated 60-amp circuit from the outdoor main breaker to the garage and a ChargePoint EV charger.

When was the EV charger permit filed?

The City of Austin filed permit 2026-080561 EP on June 26, 2026. Its status is final.

What does Austin permit 2026-080561 EP cover?

It covers the EV charger circuit and charger installation, plus surge protection on the outdoor main breaker panel.

Will the EV charger have built-in GFCI protection?

Yes. The permit description specifies a ChargePoint EV charger with built-in GFCI protection.

Is a new building planned at 3119 Eanes Cir?

The available record is for an electrical permit to install an EV charger and related equipment at a residence.

Also being built nearby

All of 78746
Get alerts for 3119 Eanes Cir