3531 Fawn Creek Path
Austin, TX 78746
3531 Fawn Creek Path: 1 project on record
City of Austin lists 1 filing across 1 project at 3531 Fawn Creek Path, Austin, TX 78746. The most recent, filed July 16, 2024, covers: “Express replace 26 existing windows”.
Compiled from City of Austin records · updated Jul 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2024
- since Jul 16, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress replace 26 existing windows
- AppliedJul 16, 2024
- IssuedJul 16, 2024
- WorkJul '24 – Dec '24
- Final inspectionDec 12, 2024
Passed final inspection Dec 12, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress replace 26 existing windows
Express replace 26 existing windows
City of Austin permitBuilding PermitFinal- Record
- 2024-087910 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3531 Fawn Creek Path
What is being built at 3531 Fawn Creek Path?
The latest filing (City of Austin permit 2024-087910 BP, July 16, 2024) covers express replace 26 existing windows.
How many permits and filings does 3531 Fawn Creek Path have?
1 filing across 1 project, from July 16, 2024 to July 16, 2024.
Is there other construction near 3531 Fawn Creek Path?
Yes. Nearby filings include 3533 Fawn Creek Path (replacement of complete existing central heat and air system with or without duct work, Sep 17, 2026); 3527 Fawn Creek Path (express: replace 21 windows (like for like), Jun 17, 2026); 3525 Fawn Creek Path (replacement of complete existing central heat and air system with or without duct work **deborah finke: replace existing 3-ton horizontal gas furnace and matched 3-ton cooling system like-for-like; no structural change, Jul 15, 2026).
How do I get alerts for new permits at 3531 Fawn Creek Path?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78746- 3533 Fawn Creek PathSep 17, 2026Replacement of complete existing central heat and air system with or without duct work · 19 m away
- 3527 Fawn Creek PathJun 17, 2026Express: replace 21 windows (like for like) · 27 m away
- 3525 Fawn Creek PathJul 15, 2026Replacement of complete existing central heat and air system with or without duct work **deborah finke: replace existing 3-ton horizontal gas furnace and matched 3-ton cooling system like-for-like; no structural change · 42 m away
- 3523 Fawn Creek PathAug 22, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 5705 Carry Back LnOct 6, 2026New construction in-ground pool and spa · 102 m away
- 3509 Fawn TrlJul 3, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 5805 Buckpasser CvJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 156 m away
- 4222 Westlake DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 158 m away
- 3507 Fawn Creek PathMar 28, 2025Express: replacing 6 windows · 172 m away
- 5710 Carry Back LnAug 26, 2026Customer has existing 200/150a outdoor main disconnect only that serves a 200a indoor service panel. scope includes replacing outdoor disconnect with 200/200 distribution panel with feed through lugs that will serve the indoor service panel · 174 m away
- 5711 Carry Back LnApr 30, 2026New construction of a single-family residence. w 4 bedroom and 4 bathrooms. covered porch and attached garage · 192 m away
- 5712 Carry Back LnJul 31, 2025Replace 40 gallon natural gas water heater · 209 m away