3602-1/2 Redbud Trl
Austin, TX 78746
Ullrich water plant upgrade and pump station electrical work
City of Austin records show a 160 MGD upgrade at the Albert H. Ullrich Water Treatment Plant, approved and released on May 7, 2020. A site plan for Ullrich Low Service Pump Station electrical feed renewal was approved and released on December 11, 2025; the records describe planned infrastructure work, not a new commercial building.
Summarized from City of Austin records · updated Dec 11, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 11, 2025
- since Feb 18, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 3602-1/2 Redbud Trl
What is being built at 3602-1/2 Redbud Trl?
City records list water treatment plant and pump station infrastructure work at this address: a 160 MGD plant upgrade and an electrical feed renewal. They do not describe a new commercial building.
What is the latest project at 3602-1/2 Redbud Trl?
The latest listed project is the Ullrich Low Service Pump Station Electrical Feed Renewal, case 12476432. Its site plan was approved and released on December 11, 2025.
Is the Ullrich water treatment plant being upgraded?
A City of Austin case for the Albert H. Ullrich Water Treatment Plant 160 MGD upgrade was approved and released on May 7, 2020. The case number is 12375061.
When was the pump station electrical feed renewal proposed?
A concept plan for the Ullrich Low Service Pump Station Electrical Feed Renewal was filed on February 18, 2020, under case 12383238, and is marked expired. A later site plan, case 12476432, was approved and released on December 11, 2025.
Are there permits for a new business at 3602-1/2 Redbud Trl?
The records provided list site-plan cases for water treatment plant and pump station work. They do not identify a business or tenant.
Also being built nearby
All of 78746- 1000 Forest View DrMar 3, 2025Building 4 new interior offices · 344 m away
- 3310 Lake Cliff CtMar 18, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton two stage horizontal gas system · 356 m away
- 3314 Lake Cliff CtApr 7, 2026Replacement of complete existing central heat and air system with or without duct work john burton roberts: replace 4-ton like-for-like gas system · 362 m away
- 500 Lake Cliff TrlJul 21, 2026Install new panel in new location on a rack instead of on the house run conduits back to house from relocated panel. new panel location is outside the fence line per austin energy · 365 m away
- 200 Birnam Wood CtApr 11, 2024Replacement of complete existing central heat and air system with or without duct work · 377 m away
- 3408 Stratford Hills LnMay 11, 2025*partial demolition* comprehensive interior remodel of two-story sfr · 385 m away
- 3400 Stratford Hills LnFeb 10, 2026Ev install · 392 m away
- 1201 Westlake DrAug 20, 2024Installation of 55.6 kw (dc) roof-mounted pv solar system. includes installation of ess (4 tesla powerwalls & 2 tesla gateways). powerwalls to be located on exterior of home (not in garage). project is being done alongside separate and already approved permit 2023-137649 ep (contractor disconnect to install the gateways for the ess) · 405 m away
- 136 Birnam Wood CtJan 3, 2025Express: window replacement (like for like). 2 windows front right · 424 m away
- 505 Lake Cliff TrlJun 17, 2025Eplan: residential expedited review - *partial demolition* addition/remodel to existing 2-story sfr to add dinning room and remodel second floor bedroom · 428 m away
- 132 Birnam Wood CtAug 25, 2026Express- replace 3 windows like-for-like · 448 m away
- 400 Lake Cliff TrlJun 2, 2025Replacement of complete existing central heat and air system with or without duct work · 463 m away