4709 Christopher Dr
Austin, TX 78746
Backup battery system permitted at 4709 Christopher Dr
An electrical permit covers installation of a backup battery system and an additional meter socket at 4709 Christopher Dr. The City of Austin permit was filed August 18, 2026, and is marked final.
Summarized from City of Austin records · updated Aug 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 18, 2026
- since Aug 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-102588 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4709 Christopher Dr
What is being installed at 4709 Christopher Dr?
A City of Austin electrical permit describes a backup battery system and an additional meter socket.
When was the permit filed for 4709 Christopher Dr?
The electrical permit was filed August 18, 2026.
What is the permit number for work at 4709 Christopher Dr?
The permit number is 2026-102588 EP.
Is the 4709 Christopher Dr permit final?
Yes. The City of Austin record lists the permit status as Final.
Is a backup battery system being installed at 4709 Christopher Dr?
Yes. The permit description says the work includes installing a backup battery system and an additional meter socket.
Also being built nearby
All of 78746- 2504 Toro Canyon RdJul 25, 2024Rebuild a 200 amp service that got burned · 76 m away
- 4707 Christopher DrSep 17, 2025Request to disconnect install 150 amp and 200 amp atss to replace existing main disconnects. not an upgrade. install 48kw generator · 79 m away
- 2701 Toro Canyon RdJan 21, 2022Christopher condominiums construction plans · 162 m away
- 2707 Toro Canyon RdMar 12, 2024New sfr in etj · 185 m away
- 2404 Camino AltoDec 21, 2023New construction etj · 190 m away
- 2309 Camino AltoMay 7, 2026Etj new service for sfr 350 amps · 250 m away
- 2600 Slow Turtle CvJun 23, 2026Existing 200 amp underground service is having problems and needs to be replaced. ae disconnect will be needed · 251 m away
- 2507 Camino AltoJan 11, 2026Etj-home builder loop per ae criteria · 277 m away
- 4 Wildwind PtMar 2, 2024Amended plat of lt 3 blk d resub of lt 24 westrim sub lt12 westlake highlands · 280 m away
- 2 Wildwind PtMay 23, 2017Kugler subdivision · 303 m away
- 2320 Matador CirJan 18, 2024Emergency riser pole repair.emergency repair work completed · 362 m away
- 2419 Trail Of MadronesOct 6, 2026200 amp panel 200amp meter base grounding · 364 m away