5 Cicero Ln
Austin, TX 78746
45.5-kW solar system with three battery units
City of Austin permits filed September 8 and October 2, 2025, indicate a 45.5-kW solar system with 100 455-watt panels and three Tesla Powerwall batteries at 5 Cicero Ln. A separate electrical permit was filed to connect the batteries to the grid. Both permits are listed as expired.
Summarized from City of Austin records · updated Oct 2, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 2, 2025
- since Sep 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredNeed this permit to connect the batteries with the grid
- AppliedSep 10, 2025
- IssuedOct 2, 2025
- !WorkOct '25 – Mar '26
- Final inspection
Marked expired Apr 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNeed this permit to connect the batteries with the grid
Need this permit to connect the batteries with the grid
City of Austin permitElectrical PermitExpired- Record
- 2025-115283 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
We are installing 45.5kw solar system with 100 canadian 455w solar panel and 3 tesla powerwall batteries
We are installing 45.5kw solar system with 100 canadian 455w solar panel and 3 tesla powerwall batteries
City of Austin permitElectrical PermitExpired- Record
- 2025-107870 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5 Cicero Ln
What is being installed at 5 Cicero Ln in Austin?
A City of Austin permit describes a 45.5-kW solar system with 100 455-watt panels and three Tesla Powerwall batteries. A separate permit covers connecting the batteries to the grid.
How many solar panels are planned for 5 Cicero Ln?
The September 8, 2025, permit description lists 100 455-watt solar panels.
Are batteries included in the solar project at 5 Cicero Ln?
Yes. The permit description lists three Tesla Powerwall batteries, and an October 2, 2025, electrical permit covers connecting the batteries to the grid.
When were permits filed for the solar system at 5 Cicero Ln?
The solar-system electrical permit, 2025-107870 EP, was filed September 8, 2025. The battery grid-connection permit, 2025-115283 EP, was filed October 2, 2025.
Are the permits for 5 Cicero Ln still active?
No. Both City of Austin electrical permits, 2025-107870 EP and 2025-115283 EP, are listed as expired.
Also being built nearby
All of 78746- 1 Cicero LnMay 8, 2026Underground service upgrade to 350amps · 98 m away
- 50 St Stephens School RdFeb 4, 2024Upgrade electrical service- cause there is a remodel · 128 m away
- 33 Pascal LnAug 18, 2026Base: installing a backup battery system and additional meter socket · 169 m away
- 27 Pascal LnSep 29, 2026Build new 400 amp electrical service on existing residence · 176 m away
- 19-1/2 Pascal LnJun 13, 2014The canyons at rob roy · 221 m away
- 10 Cicero LnJan 16, 2026Emergency repair: underground service wires hit during driveway redo. replace underground conduit and wire only · 223 m away
- 39 Pascal LnJan 16, 2025New construction of sfr in etj · 231 m away
- 20 Hedge LnNov 25, 2008Rob roy hilltop, lots a & b & rob roy ph 2, lot 6, block e, amended plat of · 234 m away
- 60 St Stephens School RdApr 2, 2026Construction power/temporary service · 248 m away
- 34 Pascal LnJun 27, 2025Upgrading electrical service from 200amps to 350amps. installing 140ft. of underground secondary power from manhole · 273 m away
- 7 Pascal LnDec 2, 2025New construction in-ground pool and spa · 303 m away
- 44 Pascal LnJun 25, 2024Upgrade service size due addition and car charger. etj house · 325 m away
More solar installs in 78746.