6401 Cedar St
Austin, TX 78746 · Eanes Independent School District
Bridgepoint Elementary playground resurfacing and rooftop solar
Permits indicate Bridgepoint Elementary at 6401 Cedar St is resurfacing its existing 32,600-square-foot playground, replacing artificial turf with poured-in-place rubber. The Texas Department of Licensing and Regulation registered the project on July 3, 2025, and lists it as closed. Austin permits filed in September 2024 cover a 479.67-kW rooftop solar system; a June 2024 permit covers partial window replacement.
Summarized from Texas Department of Licensing and Regulation, City of Austin records · updated Jul 3, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Jul 3, 2025
- since Jun 11, 2024
- Largest scope
- 32,600 sf
- Estimated cost
- $800K
- state registration
Permit & project history
5 projectsResurfacing of an existing playground from artificial turf to poured in place rubber - 32,600sf — bridgepoint elementary school
TDLR project registrationRenovation/AlterationProject Closed32,600 sq ft$800K est.- Project #
- TABS2025022748
- Tenant / owner
- Playground Resurfacing Project
- Design firm
- Pro
- Contact
- Pro
Install new 479.67 kw solar rooftop solar system to bridge point elementary school
Install new 479.67 kw solar rooftop solar system to bridge point elementary school
City of Austin permitElectrical PermitFinal- Record
- 2024-112912 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 479.67 kw solar rooftop solar system to bridge point elementary school *[solar tie-in to main electrical service / line side tap only]
Install new 479.67 kw solar rooftop solar system to bridge point elementary school *[solar tie-in to main electrical service / line side tap only]
City of Austin permitElectrical PermitFinal- Record
- 2024-112908 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new 479.67 kw solar rooftop solar system to bridge point elementary school
Install new 479.67 kw solar rooftop solar system to bridge point elementary school
City of Austin permitBuilding PermitFinal- Record
- 2024-112908 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Partial replacement of windows
Partial replacement of windows
City of Austin permitBuilding PermitFinal- Record
- 2024-051044 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation · City of Austin
Questions about 6401 Cedar St
What is being built at 6401 Cedar St in Austin?
Records show improvements at Bridgepoint Elementary, including resurfacing an existing playground with poured-in-place rubber and installing a rooftop solar system. A separate permit covers partial window replacement.
Is Bridgepoint Elementary getting a new playground?
The project is a resurfacing of the existing 32,600-square-foot playground, changing it from artificial turf to poured-in-place rubber. TDLR registered the project on July 3, 2025, under TABS2025022748 and lists it as closed.
How much is the Bridgepoint Elementary playground project estimated to cost?
The TDLR registration lists an estimated project cost of $800,000. This is the applicant's estimate for the playground project, not a reported total cost for all work at the school.
Is Bridgepoint Elementary installing solar panels?
Austin permits describe a 479.67-kW rooftop solar system at the school. The building permit was filed September 9, 2024, and electrical permits were filed September 11, 2024; all are listed as final.
Are windows being replaced at Bridgepoint Elementary?
A City of Austin building permit filed June 11, 2024, covers partial window replacement. The permit is listed as final.
What school project is happening near San Clemente Office Partners Holdco?
Bridgepoint Elementary, at 6401 Cedar St, has permits for playground resurfacing, rooftop solar installation, and partial window replacement. San Clemente Office Partners Holdco is listed about 276 meters away.
Also being built nearby
All of 78746- 4214 Capital Of Texas HwyNov 9, 2011Riverbend baptist church · 183 m away
- 4214 N Capital Of Texas Hwy SbApr 29, 2025Replace a small group of fixed seats with standing/seating platform and guardrail at existing religious assembly · 183 m away
- 3900 Capital Of Texas HwyFeb 1, 2011Davenport west c · 244 m away
- 3900 N Capital Of Texas Hwy SbJul 30, 2026Eplan review: office remodel 2nd floor suite 200 · 244 m away
- 3900 N Capital Of TX Hwy · San Clemente Office Partners Holdco LLCMar 30, 2026Sarc - 2nd and 3rd floor offices — renovation/alteration — limited remodel to (2) existing office suites · 276 m away
- 3900 N. Capital Of Texas Hwy · San Clemente Office Partners Holdco, LLCMar 3, 2026San clemente - elevator lobbies 2 & 3 — renovation/alteration — interior renovation of (2) elevator lobbies for multi-tenant floors · 276 m away
- 4010 Long Champ DrNov 2, 2026Replacement of complete existing central heat and air system with or without duct work · 291 m away
- 3800 Capital Of Texas HwyJul 13, 2023Davenport west b · 322 m away
- 6012 Messenger StakeNov 12, 2026Base: installing a backup battery system and additional meter socket · 326 m away
- 4339-1/2 Westlake DrMar 31, 2009Davenport west pud sec 5, ph 3 — davenport west pud, section 5, phase 3 · 328 m away
- 6008 Messenger StakeMar 6, 2026The residence at 6008 messenger stake requires an service upgrade. an espa will be sent to ae · 343 m away
- 6001 Messenger StakeMay 1, 2026Replaced log lighter valve · 367 m away