10009 Buffalo Lake Ln
Austin, TX 78747
Foundation repair permitted at 10009 Buffalo Lake Ln
A foundation repair project at 10009 Buffalo Lake Ln involves installing steel piers, according to an active City of Austin building permit. The permit was filed June 5, 2026, under permit number 2026-071948 BP.
Summarized from City of Austin records · updated Jun 5, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 5, 2026
- since Jun 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress- foundation repair. installing steel piers
- AppliedJun 5, 2026
- IssuedJun 5, 2026
- WorkJun '26 – Dec '26
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- foundation repair. installing steel piers
Express- foundation repair. installing steel piers
City of Austin permitBuilding PermitActive- Record
- 2026-071948 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10009 Buffalo Lake Ln
What is being built at 10009 Buffalo Lake Ln?
The City of Austin permit describes foundation repair involving the installation of steel piers. It does not indicate that a new building is being constructed.
Is a new home being built at 10009 Buffalo Lake Ln?
The permit is for foundation repair, not new home construction. It was filed June 5, 2026.
What work is permitted at 10009 Buffalo Lake Ln in Austin?
Permit 2026-071948 BP covers foundation repair and steel pier installation. The City of Austin lists the permit as active.
When was the foundation repair permit filed?
The City of Austin filed permit 2026-071948 BP on June 5, 2026.
How many steel piers will be installed at 10009 Buffalo Lake Ln?
The permit description says steel piers will be installed but does not specify how many.
Also being built nearby
All of 78747- 10013 Buffalo Lake LnAug 14, 2024(illingworth evan) - installation of circuit for elec. vehicle charging station - esip · 15 m away
- 10008 Buffalo Lake LnNov 18, 2023Express: foundation repair · 43 m away
- 10004 Buffalo Lake LnApr 9, 2024Express: foundation repair (14 steel pilings) · 46 m away
- 10028 Anahuac TrlDec 24, 2025New irrigation install · 50 m away
- 10000 Buffalo Lake LnFeb 14, 2025Tunnel under home up to 35 replace and repair all 4 and 2 pvc up to 35 hang and secure piping every 6. perform static test to check for leaks · 53 m away
- 9916 Buffalo Lake LnOct 16, 2026Express - foundation repair · 74 m away
- 1901 National Park BlvdSep 11, 2014First class child development center #3 · 75 m away
- 10100 Anahuac TrlAug 21, 2026Express- installing 6 steel push piers and 2 concentric piers · 84 m away
- 2000 National Park BlvdMay 24, 2024Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 9901 Buffalo Lake LnJun 1, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and repair or rebuild of the supply air plenum · 100 m away
- 10101 Anahuac TrlDec 7, 2023Express replace existing tub/shower with prefab shower base replace existing walls with prefab acrylic walls replace valve with posi-temp valve replace shower head · 112 m away
- 10108 Anahuac TrlMar 2, 2007Parkside at slaughter creek section 5 — parkside at slaughter creek section 5 · 113 m away