10523 River Plantation Dr
Austin, TX 78747
Rooftop solar and battery system permitted in Austin
City of Austin permits indicate a rooftop solar panel system with a Tesla Powerwall 3 battery backup at 10523 River Plantation Dr. The solar electrical permit was filed November 6, 2025, and a related permit for a new main service disconnect was filed November 19, 2025.
Summarized from City of Austin records · updated Nov 19, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2025
- since Nov 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNeed to schedule a shutdown and install the new main service disconnect in conjunction with solar permit 2025-138689ep
- AppliedNov 17, 2025
- IssuedNov 19, 2025
- WorkNov '25 – Dec '25
- Final inspectionDec 8, 2025
Passed final inspection Dec 8, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsNeed to schedule a shutdown and install the new main service disconnect in conjunction with solar permit 2025-138689ep
Need to schedule a shutdown and install the new main service disconnect in conjunction with solar permit 2025-138689ep
City of Austin permitElectrical PermitFinal- Record
- 2025-147855 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install rooftop solar panel system with tesla powerwall 3 battery backup
Install rooftop solar panel system with tesla powerwall 3 battery backup
City of Austin permitElectrical PermitFinal- Record
- 2025-138689 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10523 River Plantation Dr
What is being built at 10523 River Plantation Dr?
Austin permit 2025-138689 EP describes a rooftop solar panel system with a Tesla Powerwall 3 battery backup. It was filed November 6, 2025.
Is solar being installed at 10523 River Plantation Dr in Austin?
Yes. City of Austin permit 2025-138689 EP covers installation of a rooftop solar panel system and battery backup. The permit was filed November 6, 2025.
Is there a battery backup planned with the solar panels?
The permit description specifies a Tesla Powerwall 3 battery backup with the rooftop solar system.
What is permit 2025-147855 EP for?
The November 19, 2025, electrical permit covers a new main service disconnect in conjunction with solar permit 2025-138689 EP.
When were the solar permits filed at 10523 River Plantation Dr?
The solar permit was filed November 6, 2025, and the related main service disconnect permit was filed November 19, 2025. Both are listed as final.
Also being built nearby
All of 78747- 10519 River Plantation DrFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work replace 4 ton gas system with new trane. new xr16 condenser coil and s8x furnace on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 26 m away
- 10511 River Plantation DrAug 27, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 73 m away
- 4720 Interlachen LnNov 25, 2024Interior remodel · 107 m away
- 4725 Interlachen LnMar 27, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 4728 Interlachen LnSep 9, 2024Install evse · 140 m away
- 4800 Interlachen LnOct 27, 2025Excavate 18 tunnel to repair main drain line under house · 181 m away
- 10613 Portrush CtOct 14, 2026Install 24kw generator with 200ats · 215 m away
- 10609 Portrush CtNov 16, 2026Replacement of complete existing central heat and air system with or without duct work · 220 m away
- 4808 Interlachen LnMay 5, 2026Install new tankless water heater in garage. run new gas line for tankless water heater. gas pressure test for gas line for tankless water heater · 222 m away
- 4900 Interlachen LnOct 23, 2025Replacement of complete existing central heat and air system with or without duct work · 260 m away
- 4707 Prairie Dunes DrDec 28, 2023Express: replace 21 windows and 2 doors like for like · 267 m away
- 4800 Prairie Dunes DrMay 1, 2025Replacement of complete existing central heat and air system with or without duct work · 269 m away
More solar installs in 78747.