11003 Point Clear Ct
Austin, TX 78747
11003 Point Clear Ct: 1 project on record
City of Austin lists 1 filing across 1 project at 11003 Point Clear Ct, Austin, TX 78747. The most recent, filed March 4, 2024, covers: “For move the main gas stub out for future gas tee for tankless. the current gas meter is the back patio and the homeowners want to move it to the side of the house so they can build a porch and a patio. texas gas has approved the new location and are waiting on the line to be moved and inspected”.
Compiled from City of Austin records · updated Mar 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 4, 2024
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectFor move the main gas stub out for future gas tee for tankless. the current gas meter is the back patio and the homeowners want to move it to the side of the house so they can build a porch and a patio. texas gas has approved the new location and are waiting on the line to be moved and inspected
For move the main gas stub out for future gas tee for tankless. the current gas meter is the back patio and the homeowners want to move it to the side of the house so they can build a porch and a patio. texas gas has approved the new location and are waiting on the line to be moved and inspected
City of Austin permitPlumbing PermitFinal- Record
- 2024-026479 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11003 Point Clear Ct
What is being built at 11003 Point Clear Ct?
The latest filing (City of Austin permit 2024-026479 PP, March 4, 2024) covers for move the main gas stub out for future gas tee for tankless. the current gas meter is the back patio and the homeowners want to move it to the side of the house so they can build a porch and a patio. texas gas has approved the new location and are waiting on the line to be moved and inspected.
How many permits and filings does 11003 Point Clear Ct have?
1 filing across 1 project, from March 4, 2024 to March 4, 2024.
Is there other construction near 11003 Point Clear Ct?
Yes. Nearby filings include 11001 Point Clear Ct (replacement of complete existing central heat and air system with or without duct work, Jan 4, 2024); 11003 Onion Creek Ct (express replace 2 windows like for like, Jun 6, 2024); 10920 Preston Trails Dr (new pool with concrete deck, Jan 17, 2024).
How do I get alerts for new permits at 11003 Point Clear Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 11001 Point Clear CtJan 4, 2024Replacement of complete existing central heat and air system with or without duct work · 39 m away
- 11003 Onion Creek CtJun 6, 2024Express replace 2 windows like for like · 98 m away
- 10920 Preston Trails DrJan 17, 2024New pool with concrete deck · 113 m away
- 10918 Preston Trails DrJul 12, 2024Replacement of complete existing central heat and air system with or without duct work · 116 m away
- 11121 Pinehurst DrMay 28, 2026Complete service rebuild. like for like · 137 m away
- 2309 Inverrary CirApr 30, 2025Replacement of complete existing central heat and air system with or without duct work full system change-out with ductwork · 143 m away
- 11129 Pinehurst DrAug 21, 2024Replacement of complete existing central heat and air system with or without duct work · 182 m away
- 11125 Pinehurst DrJan 19, 2026Replacement of complete existing central heat and air system with or without duct work · 188 m away
- 2303 Inverrary CirFeb 27, 2026Replacement of an existing water heater · 193 m away
- 11009 Pinehurst DrSep 13, 2024Express: remove and replace 2 windows: like for like no structural changes · 194 m away
- 11013 Pinehurst DrFeb 27, 2024Express: remove and replace windows like for like no structural changes · 196 m away
- 11131 Pinehurst DrSep 16, 2024Replacement of complete existing central heat and air system with or without duct work · 209 m away