groundranger
Recent · latest filing Dec 2025Residential

2108 Indiana Dunes Dr

Austin, TX 78747

Central HVAC system replacement permitted in Austin

A permit covers replacement of the complete existing central heating and air-conditioning system at 2108 Indiana Dunes Dr, with or without duct work. The City of Austin issued the mechanical permit on December 31, 2025; its status is listed as Final.

Summarized from City of Austin records · updated Dec 31, 2025

Projects
1
1 filings
Latest filing
Dec 31, 2025
since Dec 31, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedDec 29, 2025
  2. IssuedDec 31, 2025
  3. WorkDec '25 – Jan '26
  4. Final inspectionJan 21, 2026

Passed final inspection Jan 21, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2108 Indiana Dunes Dr

What is being built at 2108 Indiana Dunes Dr?

The City of Austin permit covers replacing the complete existing central heat and air system, with or without duct work. It does not describe a new building.

Is a new home being built at 2108 Indiana Dunes Dr?

The record does not indicate new home construction. It is a mechanical permit for replacement of the existing central heating and air-conditioning system.

When was the HVAC replacement permitted at 2108 Indiana Dunes Dr?

The City of Austin issued permit 2025-162825 MP on December 31, 2025. The permit status is listed as Final.

Does the HVAC permit include duct work?

The permit description says the complete existing central heat and air system will be replaced, with or without duct work. It does not specify which option applies.

What is the status of permit 2025-162825 MP?

The City of Austin lists the mechanical permit as Final. It was filed on December 31, 2025.

Also being built nearby

All of 78747
Email me when a new permit is filed