2217 Onion Creek Pkwy
Austin, TX 78747
Water heater and HVAC replacements permitted at 2217 Onion Creek Pkwy
City of Austin permits at 2217 Onion Creek Pkwy cover replacing a water heater and its disconnect, plus replacement of the existing central heating and air system. The water heater permits were filed September 19, 2025, and the HVAC permit was filed July 3, 2024; all three are marked final.
Summarized from City of Austin records · updated Sep 19, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Sep 19, 2025
- since Jul 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling disconnect for e water heater
- AppliedSep 18, 2025
- IssuedSep 19, 2025
- WorkSep '25 – Nov '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstalling disconnect for e water heater
Installing disconnect for e water heater
City of Austin permitElectrical PermitFinal- Record
- 2025-118821 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacing like/like e water heater
Replacing like/like e water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-118816 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-081017 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2217 Onion Creek Pkwy
What work was permitted at 2217 Onion Creek Pkwy?
City of Austin records show permits for replacing the existing central heating and air system and replacing a water heater, with a separate permit for its electrical disconnect.
Is anything new being built at 2217 Onion Creek Pkwy?
The records provided describe replacement work on existing heating and air equipment and a water heater; they do not identify a new building.
When were permits filed for work at 2217 Onion Creek Pkwy?
The HVAC permit, 2024-081017 MP, was filed July 3, 2024. The water heater permits, 2025-118816 PP and 2025-118821 EP, were filed September 19, 2025.
What do permits 2025-118816 PP and 2025-118821 EP cover?
The plumbing permit covers replacing the water heater, and the electrical permit covers installing its disconnect. Both were filed September 19, 2025, and are marked final.
Has the HVAC work at 2217 Onion Creek Pkwy been completed?
The City of Austin record for permit 2024-081017 MP is marked final. It covers replacement of the existing central heating and air system, with or without ductwork.
Also being built nearby
All of 78747- 11009 Pinehurst DrSep 13, 2024Express: remove and replace 2 windows: like for like no structural changes · 104 m away
- 10920 Crown Colony DrDec 15, 2025Express- removing and replacing 4 windows · 104 m away
- 11013 Pinehurst DrFeb 27, 2024Express: remove and replace windows like for like no structural changes · 106 m away
- 10931 Crown Colony DrDec 10, 2025Tank style water heater replacement- in garage · 129 m away
- 2203 Onion Creek PkwyAug 17, 2026Replacement of an existing water heater water heater change out 2203 onion creek parkway #18 austin tx 78747 · 158 m away
- 2210 Onion Creek PkwyOct 28, 2026Replacement of an existing water heater 40 gal water heater change out 2210 onion creek parkway #603 austin tx 78747 · 161 m away
- 10927 Crown Colony DrMay 28, 2026Main 100amp panel restoration 125a breaker panel replacement replace internal sub panel install arc fault breakers grounding and surge protection. no meter work is being performed · 161 m away
- 10908 Pinehurst DrJul 14, 2025Replacement of complete existing central heat and air system with or without duct work attic access in hallway · 179 m away
- 2303 Inverrary CirFeb 27, 2026Replacement of an existing water heater · 181 m away
- 2300 Inverrary CirJan 13, 2025Replacement of complete existing central heat and air system with or without duct work · 190 m away
- 11215 IH 35 SvrdJul 26, 2024Onion creek business park (resubmittal of sp-03-0210d) · 208 m away
- 10908 Crown Colony DrJul 21, 2026Emergency disconnect replace main breaker like for like update grounding and add surge protection · 223 m away