5809 Abby Ann Ln
Austin, TX 78747
5809 Abby Ann Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 5809 Abby Ann Ln, Austin, TX 78747. The most recent, filed February 10, 2024, covers: “Installing irrigaiton to existing residence only”.
Compiled from City of Austin records · updated Feb 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 10, 2024
- since Feb 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstalling irrigaiton to existing residence only
- AppliedMar 1, 2010
- IssuedFeb 10, 2024
- WorkFeb '24 – Aug '24
- Final inspectionMar 28, 2024
Passed final inspection Mar 28, 2024.
Permit & project history
1 projectInstalling irrigaiton to existing residence only
Installing irrigaiton to existing residence only
City of Austin permitPlumbing PermitFinal- Record
- 2010-016530 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5809 Abby Ann Ln
What is being built at 5809 Abby Ann Ln?
The latest filing (City of Austin permit 2010-016530 PP, February 10, 2024) covers installing irrigaiton to existing residence only.
How many permits and filings does 5809 Abby Ann Ln have?
1 filing across 1 project, from February 10, 2024 to February 10, 2024.
Is there other construction near 5809 Abby Ann Ln?
Yes. Nearby filings include 5817 Abby Ann Ln (replace less than 12 of 4 pvc pipe for main sewer line. 45 degree fitting. pipe is 2 feet deep, Jan 23, 2024); 5812 Abby Ann Ln (excavate 10 tunnel and 40 trench to repair main sewer line in yard and under the house, Mar 11, 2025); 5808 Zachary Scott St (express: replace tub/shower with acrylic shower base and walls replace valves an fixtures (not relocating), May 15, 2024).
How do I get alerts for new permits at 5809 Abby Ann Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78747- 5817 Abby Ann LnJan 23, 2024Replace less than 12 of 4 pvc pipe for main sewer line. 45 degree fitting. pipe is 2 feet deep · 29 m away
- 5812 Abby Ann LnMar 11, 2025Excavate 10 tunnel and 40 trench to repair main sewer line in yard and under the house · 43 m away
- 5808 Zachary Scott StMay 15, 2024Express: replace tub/shower with acrylic shower base and walls replace valves an fixtures (not relocating) · 43 m away
- 5800 Zachary Scott StFeb 21, 2025Create tunnel access following the main sewer under the garage slab to expose the damaged wye intersection fitting. remove and replace the damaged section of pipe and fitting with approved glued pie fittings and mechanical connectors and support the exposed pipe to the underside of concrete slab. approximately 25 ft · 49 m away
- 5820 Zachary Scott StSep 30, 2026Express: foundation repair - installing 21 ext pilings · 60 m away
- 5824 Abby Ann LnSep 7, 2025Repair sewer yard line 20 if · 68 m away
- 5829 Abby Ann LnJul 23, 2026Express: foundation repair · 70 m away
- 5720 Abby Ann LnOct 1, 2024Replacement of an existing water heater · 74 m away
- 5828 Abby Ann LnMay 22, 2024Replacement of an existing water heater · 81 m away
- 5828 Zachary Scott StOct 6, 202510 tunnel below the foundation to repair main under half bath and utility room. access hole - left · 82 m away
- 5813 Silver Screen DrMar 19, 2026Emergency permit tighten down lugs on main breaker fix 2 conduit that has a gap due to ground settling · 83 m away
- 5805 Silver Screen DrAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 90 m away