8620 Panadero Dr
Austin, TX 78747
Foundation repair permitted at 8620 Panadero Dr
A foundation repair at 8620 Panadero Dr calls for installing 20 exterior and 8 interior pilings. The City of Austin permit was filed on June 12, 2026, and is listed as final.
Summarized from City of Austin records · updated Jun 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 12, 2026
- since Jun 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair - installing 20 ext & 8 int pilings
- AppliedJun 12, 2026
- IssuedJun 12, 2026
- WorkJun '26 – Jul '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair - installing 20 ext & 8 int pilings
Express: foundation repair - installing 20 ext & 8 int pilings
City of Austin permitBuilding PermitFinal- Record
- 2026-075294 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 8620 Panadero Dr
What work is permitted at 8620 Panadero Dr in Austin?
A City of Austin permit describes foundation repair involving 20 exterior and 8 interior pilings. The permit, 2026-075294 BP, was filed June 12, 2026.
Is there a foundation repair permit for 8620 Panadero Dr?
Yes. City of Austin permit 2026-075294 BP covers foundation repair and is listed as final.
How many pilings will be installed at 8620 Panadero Dr?
The permit description specifies 20 exterior and 8 interior pilings.
When was the foundation repair at 8620 Panadero Dr permitted?
The City of Austin filed permit 2026-075294 BP on June 12, 2026.
What is the status of permit 2026-075294 BP?
The City of Austin record lists the foundation repair permit as final.
Also being built nearby
All of 78747- 8701 Panadero DrOct 31, 2025Express: foundation repair · 55 m away
- 8617 Panadero DrJan 5, 2024Express: foundation repair · 56 m away
- 8712 Panadero DrMay 13, 2025New irrigation system installation · 64 m away
- 8709 Panadero DrJul 29, 2025Express: perform foundation repair by installing 14 concrete pressed pilings. additionally repair the drain line on the right side by performing a spot repair through the garage slab approximately 5 feet in length · 71 m away
- 8713 Keynes LnDec 3, 2024Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 8716 Panadero DrSep 30, 202422 tunnel to repair main drain line break under home · 80 m away
- 8713 Panadero DrAug 29, 2025Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 8620 Keynes LnFeb 21, 2025Express: 15 push piers · 85 m away
- 8700 Keynes LnMar 31, 2026Express: foundation repair · 86 m away
- 8601 Keynes LnJul 21, 2025Express - tub to shower · 90 m away
- 8612 Keynes LnAug 14, 2024Express - replace existing tub/shower with acrylic prefab shower base and acrylic wall system. replace valve and fixtures · 91 m away
- 8717 Panadero DrJan 28, 2026Express - foundation repair on a slab foundation. intend to install 27 total press piling piers along the perimeter. there will be 9 breakthrough and patched locations. we will improve level to the extent · 95 m away