groundranger
Recent · latest filing Jul 2025Commercial

10001 David Moore Dr

Austin, TX 78748 · Austin Independent School District

Paredes Elementary to get a secured entry vestibule

Paredes Elementary School’s administration and main entry area is being renovated to create a secured vestibule for students and staff; the building permit was filed May 14, 2025. The work includes access-control and technology upgrades, with minor interior, mechanical and electrical work. Separate permits cover HVAC equipment replacement, fresh-air unit repairs and boiler replacement, with the latest listed permits dated July 24, 2025.

Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Jul 24, 2025

Projects
17
17 filings
Latest filing
Jul 24, 2025
since Nov 22, 2024
Largest scope
1,000 sf
Estimated cost
$189K
state registration

Where this project stands

Finaled

Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

  1. AppliedJun 18, 2024
  2. IssuedJul 24, 2025
  3. WorkJul '25 – Aug '25
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

17 projects
  1. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    Renovating the schools existing administration and entry area to provide a secured vestibule for all students and staff. renovation consists of upgrading access control and technology security elements along with minor interior finishes mechanical and electrical scope as required

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  6. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  7. Replace approx. 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler. (main building)

    Replace approx. 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler. (main building)

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  8. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  9. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitMechanical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  10. Renovate the existing administration and main entry area to design a secured vestibule for students and staff. renovation consists of access control and technology upgrades along with minor interior finishes, mechanical, and electrical scope. — paredes elementary school

    TDLR project registrationRenovation/AlterationProject Closed1,000 sq ft$189K est.
    Tenant / owner
    Paredes Elementary School Secure Vestibule
    Design firm
    Pro
    Contact
    Pro
  11. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  12. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  13. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  14. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  15. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler for building b aisd project

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  16. Replace approx. 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler. (main building)

    Replace approx. 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler. (main building)

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  17. Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    Replace approx 40% of hvac equipment that has failed or is in poor condition. repair fresh air units and replace boiler

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin · Texas Department of Licensing and Regulation

Questions about 10001 David Moore Dr

What is being built at 10001 David Moore Dr?

Permits indicate a renovation of Paredes Elementary School’s administration and main entry area to create a secured vestibule for students and staff. The scope includes access-control and technology upgrades.

When was the Paredes Elementary secured vestibule permitted?

The building permit, 2025-054568 BP, was filed May 14, 2025. Electrical and mechanical permits for the vestibule work followed on July 15 and 16, 2025.

What work is included in the Paredes Elementary renovation?

The permit description lists access-control and technology security upgrades, minor interior finishes, and related mechanical and electrical work.

Are there HVAC upgrades at Paredes Elementary in Austin?

Yes. Permits describe replacing about 40% of the HVAC equipment, repairing fresh-air units and replacing a boiler. The latest listed permits for this work are dated July 24, 2025.

How much is the Paredes Elementary vestibule project estimated to cost?

The TDLR registration lists an estimated project cost of $189,000. This is the applicant’s estimate for the project, not a reported permit valuation.

What is the permit number for the Paredes Elementary vestibule work?

The building permit is 2025-054568 BP. The project is also listed in TDLR as TABS2025007419.

Also being built nearby

All of 78748

More schools & daycares in 78748.

Email me when a new permit is filed