10425 Beard Ave
Austin, TX 78748
10425 Beard Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 10425 Beard Ave, Austin, TX 78748. The most recent, filed May 6, 2025, covers: “Replace prv in yard”.
Compiled from City of Austin records · updated May 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 6, 2025
- since May 6, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace prv in yard
Replace prv in yard
City of Austin permitPlumbing PermitFinal- Record
- 2025-052312 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10425 Beard Ave
What is being built at 10425 Beard Ave?
The latest filing (City of Austin permit 2025-052312 PP, May 6, 2025) covers replace prv in yard.
How many permits and filings does 10425 Beard Ave have?
1 filing across 1 project, from May 6, 2025 to May 6, 2025.
Is there other construction near 10425 Beard Ave?
Yes. Nearby filings include 10421 Beard Ave (replace existing meter/panel with new 200a meter base and 200a main breaker panel, Jan 9, 2026); 10500 Beard Ave (install 50 gal ng water heater, Oct 17, 2024); 10300 Autumn Wood Dr (replacement of an existing water heater installing like/like e water heater, Mar 6, 2025).
How do I get alerts for new permits at 10425 Beard Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 10421 Beard AveJan 9, 2026Replace existing meter/panel with new 200a meter base and 200a main breaker panel · 17 m away
- 10500 Beard AveOct 17, 2024Install 50 gal ng water heater · 57 m away
- 10300 Autumn Wood DrMar 6, 2025Replacement of an existing water heater installing like/like e water heater · 58 m away
- 10216 Autumn Wood DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 70 m away
- 2600 Drew LnDec 16, 2016Autumn wood · 71 m away
- 10513 Beard AveAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 2605 Bolton StMar 12, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 10501 Huxley StOct 3, 2025Express: foundation repair (installing 12 exterior pilings and 3 interior pilings) · 89 m away
- 10405 Huxley StJun 9, 2025Express: foundation repair window replacement (like for like) · 95 m away
- 10513 Huxley StJun 17, 2024We plan to install an 8.8kw solar system on the residential roof · 110 m away
- 2605 Autumn Leaf CtJul 28, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: york 2 ton 16 seer2 heat pump · 114 m away
- 10521 Beard AveFeb 16, 2024Replacement of an existing water heater · 120 m away