10804 Sea Hero Ct
Austin, TX 78748
EV charger installation permitted at 10804 Sea Hero Ct
An EV charger installation was permitted at the Austin home on March 19, 2026. A permit filed April 24, 2025, covers replacement of the existing central heating and air system. Both permits are listed as final.
Summarized from City of Austin records · updated Mar 19, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 19, 2026
- since Apr 24, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstallation of ev charger
- AppliedMar 18, 2026
- IssuedMar 19, 2026
- WorkMar '26 – Mar '26
- Final inspectionMar 25, 2026
Passed final inspection Mar 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstallation of ev charger
Installation of ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-032852 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2025-048639 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 10804 Sea Hero Ct
What work is permitted at 10804 Sea Hero Ct?
City of Austin records show an EV charger installation and replacement of the existing central heat and air system.
Was an EV charger permitted at 10804 Sea Hero Ct?
Yes. Permit 2026-032852 EP, filed March 19, 2026, covers installation of an EV charger and is listed as final.
When was the EV charger permit filed at 10804 Sea Hero Ct?
The permit was filed March 19, 2026. Its number is 2026-032852 EP.
Is the heating and air system being replaced at 10804 Sea Hero Ct?
A City of Austin mechanical permit covers replacement of the existing central heat and air system, with or without duct work. Permit 2025-048639 MP was filed April 24, 2025, and is listed as final.
Are these permits for a new building at 10804 Sea Hero Ct?
The records describe an EV charger installation and replacement of an existing heating and air system; they do not describe construction of a new building.
Also being built nearby
All of 78748- 10800 Sea Hero CtNov 17, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: rheem 5 ton 16 seer2 straight cool system gas required · 22 m away
- 10808 Sea Hero CtMay 13, 2025Power run for ev charger · 28 m away
- 10717 Sea Hero LnJul 11, 2025225a main panel upgrade · 57 m away
- 10713 Sea Hero LnJul 15, 2026Minor spot repair for water supply line - cut out the broken pvc male adapter and splice in a new secure pvc adapter and pipe section to restore a water tight connection.4x4 section · 59 m away
- 10809 Sea Hero CtDec 5, 2025Replacement of complete existing central heat and air system with or without duct work · 68 m away
- 10816 Sea Hero CtMay 1, 2024New pool and retro actively permitting wooden deck · 69 m away
- 10821 Sea Hero CtOct 2, 2026Base: installing a backup battery system and additional meter socket · 93 m away
- 10720 Sea Hero LnSep 1, 2025Replacement of complete existing central heat and air system with or without duct work replace ac system no ductwork · 104 m away
- 10808 Sea Hero LnDec 10, 2025Replacement of complete existing central heat and air system with or without duct work · 120 m away
- 520 Paul Jones PassApr 11, 2025Replacement of complete existing central heat and air system with or without duct work residential hvac changeout · 193 m away
- 11013 Fonso LnOct 21, 2025Replacing tank style gas water heater with a tankless gas water heater inside the garage · 200 m away
- 10812 Clubhouse Turn DrOct 3, 2025Replacement of complete existing central heat and air system with or without duct work · 201 m away