11330 Farrah Ln
Austin, TX 78748
Roof replacement at an existing assisted living center
A shingle roof replacement is recorded for an existing assisted living center at 11330 Farrah Ln. The City of Austin permit was filed October 29, 2024, and is marked final; the work does not include structural changes.
Summarized from City of Austin records · updated Oct 29, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Oct 29, 2024
- since Mar 19, 2012
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledShingle roof replacement with no structural changes for an existing assisted living center
- AppliedOct 21, 2024
- IssuedOct 29, 2024
- WorkOct '24 – Nov '24
- Final inspectionNov 12, 2024
Passed final inspection Nov 12, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
3 projectsShingle roof replacement with no structural changes for an existing assisted living center
Shingle roof replacement with no structural changes for an existing assisted living center
City of Austin permitBuilding PermitFinal- Record
- 2024-141729 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11330 Farrah Ln
What is being built at 11330 Farrah Ln?
The October 29, 2024 City of Austin permit describes a shingle roof replacement at an existing assisted living center, with no structural changes.
Is a new assisted living center being built at 11330 Farrah Ln?
The latest permit is for roof replacement at an existing assisted living center, not new construction. It is permit 2024-141729 BP.
When was the roof replacement at 11330 Farrah Ln permitted?
The City of Austin permit, 2024-141729 BP, was filed October 29, 2024.
What kind of roof work is planned at 11330 Farrah Ln?
Permit 2024-141729 BP describes replacement of the existing roof with shingles. The permit says there are no structural changes.
Is the 11330 Farrah Ln permit approved?
The City of Austin lists permit 2024-141729 BP as final.
Also being built nearby
All of 78748- 11301 Farrah LnMar 30, 2012Platinum onion creek · 112 m away
- 11300 Farrah LnNov 16, 2026Installation of emergency diesel generator. there are no trees 8 or greater in or adjacent to the limits of construction · 163 m away
- 1700 Onion Creek PkwyDec 10, 2009Meridian senior living facility · 192 m away
- 11400 Old San Antonio RdOct 6, 2014Whitehouse tract(with/resub of sp-2012-0369d) · 197 m away
- 100-1/2 Anacua LoopOct 4, 2021100-1/2 anacua loop · 198 m away
- 11300 Old San Antonio RdApr 24, 2026Southside church · 284 m away
- 11410 Old San Antonio RdMar 2, 2007White house — white house · 307 m away
- 205 Anacua LoopApr 27, 2021Southpark apartments · 315 m away
- 1901 Onion Creek PkwyOct 29, 2008Colonial grand at double creek · 317 m away
- 307 FM 1626 RdMar 2, 2007307 f.m. 1626 · 325 m away
- 500 E FM 1626 RdOct 21, 2026Install 13 zones of irrigation system of 1inch pvc pipe at a new gas station being built · 329 m away
- 500 FM 1626 RdAug 15, 2024Double creek c-store site development · 329 m away