11605 James B Connolly Ln
Austin, TX 78748
11605 James B Connolly Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11605 James B Connolly Ln, Austin, TX 78748. The most recent, filed June 18, 2024, covers: “Express: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet”.
Compiled from City of Austin records · updated Jun 18, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jun 18, 2024
- since Jun 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet
- AppliedJun 17, 2024
- IssuedJun 18, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 17, 2024
Passed final inspection Jul 17, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExpress: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet
Express: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet
City of Austin permitPlumbing PermitFinal- Record
- 2024-075849 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet
Express: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet
City of Austin permitBuilding PermitFinal- Record
- 2024-075849 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11605 James B Connolly Ln
What is being built at 11605 James B Connolly Ln?
The latest filing (City of Austin permit 2024-075849 PP, June 18, 2024) covers express: bathroom remodel-upstairs master bath tub to shower conversion replace valve/faucet.
How many permits and filings does 11605 James B Connolly Ln have?
2 filings across 2 projects, from June 18, 2024 to June 18, 2024.
Is there other construction near 11605 James B Connolly Ln?
Yes. Nearby filings include 11615 James B Connolly Ln (excavation crew will excavate area in garage for access hole then excavate approx. 5 feet in both directions following the main sewer line. tunnel roughly 10 feet to repair sewer line, Mar 15, 2025); 2201 Mary Lou Retton Ln (replacement of complete existing central heat and air system with or without duct work, May 9, 2024); 2215 Billy Fiske Ln (replacement of complete existing central heat and air system with or without duct work david ryan, May 13, 2026).
How do I get alerts for new permits at 11605 James B Connolly Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 11615 James B Connolly LnMar 15, 2025Excavation crew will excavate area in garage for access hole then excavate approx. 5 feet in both directions following the main sewer line. tunnel roughly 10 feet to repair sewer line · 62 m away
- 2201 Mary Lou Retton LnMay 9, 2024Replacement of complete existing central heat and air system with or without duct work · 73 m away
- 2215 Billy Fiske LnMay 13, 2026Replacement of complete existing central heat and air system with or without duct work david ryan · 111 m away
- 2204 Billy Fiske LnJun 20, 2026Replacement of complete existing central heat and air system with or without duct work · 118 m away
- 2206 Billy Fiske LnJul 28, 2026Cleare - 39-92688 - install new/additional 5.76 kw rooftop solar system to existing residential only using backfed breaker. utility company - pedernales electric cooperative · 119 m away
- 11509 James B Connolly LnNov 26, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 121 m away
- 11505 James B Connolly LnJul 8, 2026Replacement of an existing water heater 40 gal water heater change out 11505 james b connolly lane austin tx 78748 · 148 m away
- 11519 Jim Thorpe LnApr 11, 2025Replacement of an existing water heater replace 40gal gas water heater · 160 m away
- 1611 Airedale RdSep 11, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton gas horizontal · 185 m away
- 11612 Jim Thorpe LnNov 8, 2024Replacement of an existing water heater · 192 m away
- 2207 Marcus Abrams BlvdMay 24, 2024Replace 40ft of water line · 198 m away
- 2307 Billy Fiske LnAug 6, 2025Replacement of complete existing central heat and air system with or without duct work · 199 m away