12220 Lostwood Cir
Austin, TX 78748
12220 Lostwood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 12220 Lostwood Cir, Austin, TX 78748. The most recent, filed November 29, 2023, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Nov 29, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 29, 2023
- since Nov 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedNov 28, 2023
- IssuedNov 29, 2023
- WorkNov '23 – Jan '24
- Final inspectionJan 16, 2024
Passed final inspection Jan 16, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2023-152239 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 12220 Lostwood Cir
What is being built at 12220 Lostwood Cir?
The latest filing (City of Austin permit 2023-152239 BP, November 29, 2023) covers express: foundation repair.
How many permits and filings does 12220 Lostwood Cir have?
1 filing across 1 project, from November 29, 2023 to November 29, 2023.
Is there other construction near 12220 Lostwood Cir?
Yes. Nearby filings include 12224 Lostwood Cir (main breaker replacement, Jun 9, 2026); 12524-1/2 Tabor Oaks Dr (johnson development off-site prv station, Apr 30, 2014); 12225 Lostwood Cir (express existing foundation repair, Jun 28, 2024).
How do I get alerts for new permits at 12220 Lostwood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 12224 Lostwood CirJun 9, 2026Main breaker replacement · 36 m away
- 12524-1/2 Tabor Oaks DrApr 30, 2014Johnson development off-site prv station · 72 m away
- 12225 Lostwood CirJun 28, 2024Express existing foundation repair · 77 m away
- 2813 Cavern Mist LnOct 27, 2026Express: foundation repair-installing steel piers under pool to stabilize · 98 m away
- 12304 Lostwood CirJan 12, 2026Express- install 7 push piers · 101 m away
- 2816 Bear Springs TrlJan 25, 2024Express: 240 linear feet of cinder block and stone wall set inside property line so as to not affect existing wood fence shared with 2 neighbors. wall runs approx. 85% of the length of the existing wood fence. with a change in grade greater than 2 the stone wall begins at 6 and tops out at 8 at the back of the property. plans and finish material approved by hoa · 108 m away
- 12200 Lostwood CirMar 12, 2024Replacement of an existing water heater · 136 m away
- 2800 Bear Springs TrlMay 19, 2025New inground swimming pool and spa with reqd enclosure device for existing 2 story single-family residence · 143 m away
- 12513 Tabor Oaks DrJul 10, 2026Express- existing foundation repair as per scope of work attached. warranty repairs · 149 m away
- 2716 Bear Springs TrlDec 16, 2024Express: replace 9 windows like for like · 152 m away
- 12512 Gun Metal DrSep 26, 2024Replacement of an existing water heater · 156 m away
- 2817 Bear Springs TrlMar 27, 2026Replacement of an existing water heater · 160 m away