12420 Hewitt Ln
Austin, TX 78748
12420 Hewitt Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12420 Hewitt Ln, Austin, TX 78748 since March 20, 2009. The most recent, filed February 24, 2014, covers: “Shepherd of the hills @ st. johns presbyterian church portable building”.
Compiled from City of Austin records · updated Feb 24, 2014
- Projects
- 2
- 2 filings
- Latest filing
- Feb 24, 2014
- since Mar 20, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 12420 Hewitt Ln
What is being built at 12420 Hewitt Ln?
The latest filing (City of Austin case 10863423, February 24, 2014) covers shepherd of the hills @ st. johns presbyterian church portable building.
How many permits and filings does 12420 Hewitt Ln have?
2 filings across 2 projects, from March 20, 2009 to February 24, 2014.
What is being built near King's Cross Reformed Church in Austin?
12420 Hewitt Ln is about 113 m from King's Cross Reformed Church (12420 Hewitt Lane). Its latest filing is for shepherd of the hills @ st. johns presbyterian church portable building.
Is there other construction near 12420 Hewitt Ln?
Yes. Nearby filings include 12573 Brodie Ln (bridges at bear creek ph 1, sec 1 (aka dakota springs) — dakota springs - phase 1, section 1, Dec 28, 2007); 12420 Hewitt Lane (king's cross reformed church — renovation/alteration — interior renovation to an existing church building with no change in use, Dec 30, 2025); 2112 Turtle Mountain Bnd (replacement of complete existing central heat and air system with or without duct work, Aug 28, 2024).
How do I get alerts for new permits at 12420 Hewitt Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 12573 Brodie LnDec 28, 2007Bridges at bear creek ph 1, sec 1 (aka dakota springs) — dakota springs - phase 1, section 1 · 112 m away
- 12420 Hewitt Lane · King's Cross Reformed ChurchDec 30, 2025King's cross reformed church — renovation/alteration — interior renovation to an existing church building with no change in use · 113 m away
- 2112 Turtle Mountain BndAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 121 m away
- 2124 Turtle Mountain BndJun 3, 2026Express- remove and replace shingles and remove and replace roof decking · 121 m away
- 2201 Turtle Mountain BndOct 2, 2026Replacement of complete existing central heat and air system with or without duct work · 169 m away
- 2217 Turtle Mountain BndNov 28, 2023Express: foundation repair/level of slab by concrete pressed piers. set 11 exterior segmented pressed piers · 215 m away
- 12405 Black Hills DrJun 24, 2008Bridges at bear creek ph 1 sec 1, resubdivision of lot 47 · 254 m away
- 12580 Brodie LnDec 10, 2009Bridges at bear creek phase 2 sec 2- demolition plan · 268 m away
- 2000 FM 1626 RdFeb 18, 2026Commercial driveway & grading · 273 m away
- 2416 Sully Creek DrFeb 18, 2025In ground swimming pool and spa with required enclosure device for existing sfr with concrete deck · 282 m away
- 2201 Williston LoopFeb 11, 2026Replacement of an existing water heater replace tankless water heater located in garage · 285 m away
- 13025 Bismark DrSep 29, 2026Generator gas line · 300 m away