1405 Waldrop Cv
Austin, TX 78748
1405 Waldrop Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 1405 Waldrop Cv, Austin, TX 78748. The most recent, filed November 15, 2023, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Nov 15, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 15, 2023
- since Nov 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedNov 14, 2023
- IssuedNov 15, 2023
- WorkNov '23 – Dec '23
- Final inspectionDec 13, 2023
Passed final inspection Dec 13, 2023.
1 contact on this project
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-147825 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1405 Waldrop Cv
What is being built at 1405 Waldrop Cv?
The latest filing (City of Austin permit 2023-147825 PP, November 15, 2023) covers replacement of an existing water heater.
How many permits and filings does 1405 Waldrop Cv have?
1 filing across 1 project, from November 15, 2023 to November 15, 2023.
Is there other construction near 1405 Waldrop Cv?
Yes. Nearby filings include 1312 Tetbury Ln (replacement of complete existing central heat and air system with or without duct work, Feb 21, 2025); 1316 Tetbury Ln (replacement of an existing water heater replace the existing 40-gallon natural gas water heater with a new unit of the same size and type in garage, Aug 26, 2025); 1404 Waldrop Cv (installing hardwired circuit for ev charging, Jul 15, 2024).
How do I get alerts for new permits at 1405 Waldrop Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 1312 Tetbury LnFeb 21, 2025Replacement of complete existing central heat and air system with or without duct work · 45 m away
- 1316 Tetbury LnAug 26, 2025Replacement of an existing water heater replace the existing 40-gallon natural gas water heater with a new unit of the same size and type in garage · 46 m away
- 1404 Waldrop CvJul 15, 2024Installing hardwired circuit for ev charging · 53 m away
- 1400 Tetbury LnNov 4, 2024Express: replace 11 existing windows · 59 m away
- 8516 Dempsey LnDec 8, 2024Replace breaker panel next to the meter box · 69 m away
- 1317 Tetbury LnApr 30, 2024Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 1305 Tetbury LnMar 25, 2025Express: replace siding · 101 m away
- 8529 Dempsey LnJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 1405 Wheatfall LnJun 30, 2026Express: re-roofing (located in wui) · 105 m away
- 1416 Wheatfall LnJun 9, 2025Install a new 240v/50a gfci-protected branch circuit in an existing single-family dwelling unit · 151 m away
- 8513 Davis Oaks TrlSep 19, 2025Replacement of an existing water heater · 170 m away
- 1404 Strickland DrApr 24, 2026We will be trenching and replacing 30ft of the water supply line · 170 m away