200 Camperdown Elm Dr
Austin, TX 78748
30 existing windows to be replaced at 200 Camperdown Elm Dr
A City of Austin permit indicates that 30 existing windows will be replaced size for size at this residence. The permit was filed April 8, 2026, and is marked final.
Summarized from City of Austin records · updated Apr 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2026
- since Apr 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- replace 30 existing windows size for size
- AppliedApr 7, 2026
- IssuedApr 8, 2026
- WorkApr '26 – Jun '26
- Final inspectionJun 30, 2026
Passed final inspection Jun 30, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- replace 30 existing windows size for size
Express- replace 30 existing windows size for size
City of Austin permitBuilding PermitFinal- Record
- 2026-042030 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 200 Camperdown Elm Dr
What is being done at 200 Camperdown Elm Dr?
A City of Austin permit covers replacing 30 existing windows size for size. Permit 2026-042030 BP was filed April 8, 2026.
Is a new house being built at 200 Camperdown Elm Dr?
The permit record describes window replacement, not construction of a new house. It is a building permit filed April 8, 2026.
How many windows are being replaced at 200 Camperdown Elm Dr?
The permit describes replacement of 30 existing windows, size for size.
When was the window replacement permitted at 200 Camperdown Elm Dr?
The City of Austin permit was filed April 8, 2026, and its status is listed as final.
What is being changed near Austin Independent School District in 78748?
At 200 Camperdown Elm Dr, a City of Austin permit covers replacing 30 existing windows size for size. The site is listed about 288 meters from Austin Independent School District.
Also being built nearby
All of 78748- 10209 Salem Oak CvAug 1, 2024Replacement of condenser only · 129 m away
- 10228 English Oak DrApr 22, 2026Express: foundation repair - install 11 total pilings revision: plumbing bros is needing to complete plumbing work at this property. their scope of work is 6ft tunnel under slab to repair a break on a drain line. we need to add this to our current permit so that they can order their permit and do the work. once everything is done we will then order the required inspections to close out the permit · 134 m away
- 237 Camperdown Elm DrApr 18, 2025Replacement of an existing water heater · 191 m away
- 309 Hogg Pecan PassSep 14, 2007Oak at twin creeks sec 4 — oak at twin creeks section 4 · 209 m away
- 10208 English Oak DrMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 211 m away
- 305 Camperdown Elm DrApr 10, 2026Construct new driveway approach of 28 ft and sidewalk of 11ft 6in with curb/gutter of 91.2ft · 225 m away
- 312 Camperdown Elm DrFeb 5, 2026Replacement of complete existing central heat and air system with or without duct work hallway mechanical closet · 226 m away
- 221 Kissing Oak DrMay 8, 2026Replacement of an existing water heater v 50-gallon electric water heater change out 221 kissing oak drive austin tx 78748 u · 229 m away
- 312 Hogg Pecan PassNov 21, 2025Replacement of electric water heater · 243 m away
- 309 Camperdown Elm DrJan 2, 2025Express: repairs due to fire damage (replace drywall cabinetry insulation and flooring to existing structure trade work (plumbing electrical mechanical) roofing soffits gutters and windows) · 251 m away
- 316 Hogg Pecan PassAug 13, 2025(kashyap piyush) - installation of circuit for elec. vehicle charging station - esip · 261 m away
- 320 Camperdown Elm DrNov 17, 2026Replacement of an existing water heater 50 gallon electric water heater replacement · 266 m away