2100 Marcus Abrams Blvd
Austin, TX 78748
2100 Marcus Abrams Blvd: 1 project on record
City of Austin lists 1 filing across 1 project at 2100 Marcus Abrams Blvd, Austin, TX 78748. The most recent, filed March 2, 2007, covers: “Olympic heights amenity site”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 1
- 1 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2100 Marcus Abrams Blvd
What is being built at 2100 Marcus Abrams Blvd?
The latest filing (City of Austin case 235560, March 2, 2007) covers olympic heights amenity site.
How many permits and filings does 2100 Marcus Abrams Blvd have?
1 filing across 1 project, from March 2, 2007 to March 2, 2007.
Is there other construction near 2100 Marcus Abrams Blvd?
Yes. Nearby filings include 2013 Marcus Abrams Blvd (replacement of an existing water heater, Apr 10, 2024); 1906 Ralph C Craig Ln (replaced prv in yard, Aug 15, 2025); 2003 Jesse Owens Dr (replacement of complete existing central heat and air system with or without duct work, Jul 31, 2024).
How do I get alerts for new permits at 2100 Marcus Abrams Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 2013 Marcus Abrams BlvdApr 10, 2024Replacement of an existing water heater · 52 m away
- 1906 Ralph C Craig LnAug 15, 2025Replaced prv in yard · 83 m away
- 2003 Jesse Owens DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 2000 Jesse Owens DrMay 12, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2.5 ton ac system and repair or rebuild of the supply air plenum · 118 m away
- 11505 James B Connolly LnJul 8, 2026Replacement of an existing water heater 40 gal water heater change out 11505 james b connolly lane austin tx 78748 · 124 m away
- 2207 Marcus Abrams BlvdMay 24, 2024Replace 40ft of water line · 149 m away
- 11509 James B Connolly LnNov 26, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton vertical gas system · 150 m away
- 1815 Ralph C Craig LnJul 1, 2026125amp main breaker panel replacement. no meter work done. electric provider is pec · 164 m away
- 11417 Eddie Egan LnFeb 5, 2025Replacement of complete existing central heat and air system with or without duct work · 164 m away
- 2204 Billy Fiske LnJun 20, 2026Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 2211 Marcus Abrams BlvdMay 27, 2025Replacement of an existing water heater 40gal gas tank · 167 m away
- 2206 Billy Fiske LnJul 28, 2026Cleare - 39-92688 - install new/additional 5.76 kw rooftop solar system to existing residential only using backfed breaker. utility company - pedernales electric cooperative · 167 m away