2209 Wilma Rudolph Rd
Austin, TX 78748
2209 Wilma Rudolph Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 2209 Wilma Rudolph Rd, Austin, TX 78748. The most recent, filed January 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jan 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 3, 2024
- since Jan 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJan 2, 2024
- IssuedJan 3, 2024
- WorkJan '24 – Jun '24
- Final inspectionJun 25, 2024
Passed final inspection Jun 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-000089 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2209 Wilma Rudolph Rd
What is being built at 2209 Wilma Rudolph Rd?
The latest filing (City of Austin permit 2024-000089 MP, January 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 2209 Wilma Rudolph Rd have?
1 filing across 1 project, from January 3, 2024 to January 3, 2024.
Is there other construction near 2209 Wilma Rudolph Rd?
Yes. Nearby filings include 2211 Wilma Rudolph Rd (replacement of an existing water heater, Mar 20, 2025); 2202 Jesse Owens Dr (we will be replacing all water lines in the house as well as replacing the water line in the front yard. we will be cutting less than 10ftsq of drywall to make repairs and we will be trenching 40ft for the water line in the yard. we will also be replacing the gas tank water heater for similar model, Feb 3, 2026); 2111 Wilma Rudolph Rd (express: install 3 windows and patio door, Sep 23, 2024).
How do I get alerts for new permits at 2209 Wilma Rudolph Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 2211 Wilma Rudolph RdMar 20, 2025Replacement of an existing water heater · 12 m away
- 2202 Jesse Owens DrFeb 3, 2026We will be replacing all water lines in the house as well as replacing the water line in the front yard. we will be cutting less than 10ftsq of drywall to make repairs and we will be trenching 40ft for the water line in the yard. we will also be replacing the gas tank water heater for similar model · 43 m away
- 2111 Wilma Rudolph RdSep 23, 2024Express: install 3 windows and patio door · 62 m away
- 2302 Wilma Rudolph RdSep 30, 2024Replacement of complete existing central heat and air system with or without duct work · 66 m away
- 2111 Jesse Owens DrJan 19, 2024Express replace 8 existing windows · 80 m away
- 2306 Wilma Rudolph RdJan 6, 202645 tunnel below the foundation to repair the main drain line. 2 access - front back · 87 m away
- 2305 Riker Ridge TrlOct 13, 2026Replacement of complete existing central heat and air system with or without duct work like for like 3 ton vertical heat pump lyric t6 pro wi-fi th6320wf2003 · 93 m away
- 11502 Dub DrMar 14, 2025Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 11506 Dub DrFeb 22, 2024Replacement of an existing gas water heater · 104 m away
- 11508 Dub DrMar 17, 2026Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork · 109 m away
- 2304 Jesse Owens DrMay 12, 202510ft tunnel underslab to repair breaks on drain lines · 152 m away
- 11425 Blairview LnNov 4, 202520 tunnel below the foundation to repair master bathroom branch drain line. access hole on right by master bath · 154 m away