2525 Lavendale Ct
Austin, TX 78748
Electrical panel replacement permitted at 2525 Lavendale Ct
A permit indicates replacement of the outdoor 150-amp main panel and interior subpanel at 2525 Lavendale Ct, with grounding and surge protection added. The City of Austin issued the electrical permit on October 13, 2026; its status is final.
Summarized from City of Austin records · updated Oct 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 13, 2026
- since Oct 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled150amp outdoor main panel and interior sub panel replacement adding grounding and surge protection. no meter work. pec is the electric provider
- AppliedOct 8, 2026
- IssuedOct 13, 2026
- WorkOct '26 – Oct '26
- Final inspectionOct 26, 2026
Passed final inspection Oct 26, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project150amp outdoor main panel and interior sub panel replacement adding grounding and surge protection. no meter work. pec is the electric provider
150amp outdoor main panel and interior sub panel replacement adding grounding and surge protection. no meter work. pec is the electric provider
City of Austin permitElectrical PermitFinal- Record
- 2026-132453 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2525 Lavendale Ct
What is being built at 2525 Lavendale Ct?
The permit describes electrical work, not a new building: replacement of the outdoor main panel and interior subpanel, with grounding and surge protection added.
What work was permitted at 2525 Lavendale Ct in Austin?
The City of Austin permit covers a 150-amp outdoor main panel and interior subpanel replacement. It specifies no meter work.
When was the electrical permit issued for 2525 Lavendale Ct?
The City of Austin issued permit 2026-132453 EP on October 13, 2026. Its status is final.
Is a new house being built at 2525 Lavendale Ct?
The available permit record does not describe new home construction. It documents replacement of electrical panels and added grounding and surge protection.
Who provides electricity at 2525 Lavendale Ct?
The permit lists PEC as the electric provider.
Also being built nearby
All of 78748- 2524 Lavendale CtJun 5, 2026We are tunneling under home to make a repair to a broken drain and sagging portion of the drain system · 59 m away
- 2509 Lavendale CtFeb 13, 2025Express: remove and replace 20 windows: like for like no structural changes · 65 m away
- 2541 Lavendale CtApr 9, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 11321 Blairview LnFeb 21, 2024Express: replace 13 windows · 100 m away
- 11413 Kingsgate DrDec 11, 2025Apply for electrical permit for mechanical permit 2025-124255 mp (per failed inspection: electric permit required for the new conductors suppling the furnace..) · 116 m away
- 11309 Blairview LnSep 15, 2026Express- remove and replace drywall. replace electrical receptacles. replace plumbing fixtures. new hvac. 3 damaged windows being replaced size for size. insulation drywall bathrooms kitchen etc · 117 m away
- 11425 Blairview LnNov 4, 202520 tunnel below the foundation to repair master bathroom branch drain line. access hole on right by master bath · 139 m away
- 11232 Pickard LnAug 30, 2024Install new 11.5kw energy storage system for existing residential only. this is in addition to an existing solar system. disconnect/reconnect power to tie in pv/ess components and install a tesla socket mounted backup switch that is rated up to 200amp. we are not upgrading the size of the service not upgrading the meter size · 143 m away
- 11316 Blairview LnNov 16, 2023Install new energy storage system on existing residence. pec · 145 m away
- 2431 Lavendale CtJan 24, 2024Replacement of an existing water heater · 153 m away
- 2305 Riker Ridge TrlOct 13, 2026Replacement of complete existing central heat and air system with or without duct work like for like 3 ton vertical heat pump lyric t6 pro wi-fi th6320wf2003 · 158 m away
- 11224 Pickard LnMar 19, 2024Replacement of complete existing central heat and air system with or without duct work · 164 m away