HVAC and tankless water-heater work at 2620 Blake St
City of Austin permits indicate replacement of the existing central heat and air system and installation of a tankless water heater at 2620 Blake St. The plumbing and electrical permits were filed December 26 and 29, 2025, and the mechanical permit was filed July 8, 2026; all three are marked final.
Summarized from City of Austin records · updated Jul 8, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 8, 2026
- since Dec 26, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJul 1, 2026
- IssuedJul 8, 2026
- WorkJul '26 – Sep '26
- Final inspectionSep 4, 2026
Passed final inspection Sep 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-084582 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Add circuit for tankless
Add circuit for tankless
City of Austin permitElectrical PermitFinal- Record
- 2025-161804 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing tankless water g heater
Installing tankless water g heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-161802 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2620 Blake St
What is being built at 2620 Blake St in Austin?
Permits indicate work on the existing home’s central heat and air system and installation of a tankless water heater. The records do not describe a new building.
Is a new home being built at 2620 Blake St?
The City of Austin records listed here describe mechanical, plumbing, and electrical work, not construction of a new home.
When were permits filed for 2620 Blake St?
The plumbing permit was filed December 26, 2025, the electrical permit December 29, 2025, and the mechanical permit July 8, 2026.
What HVAC work is permitted at 2620 Blake St?
Permit 2026-084582 MP, filed July 8, 2026, covers replacement of the complete existing central heat and air system, with or without duct work.
Is a tankless water heater being installed at 2620 Blake St?
Yes. Plumbing permit 2025-161802 PP, filed December 26, 2025, describes installing a tankless water heater.
Why is there an electrical permit at 2620 Blake St?
Electrical permit 2025-161804 EP, filed December 29, 2025, is for adding a circuit for the tankless water heater.
Also being built nearby
All of 78748- 2617 Blake StOct 27, 2026Replacement of an existing water heater 50 gal water heater change out 2617 blake street austin tx 78748 · 58 m away
- 10208 Beard AveJan 30, 2025Construction of new in ground pool · 77 m away
- 2637 Alcott LnApr 29, 2026Replacement of an existing water heater unit b of the duplex · 86 m away
- 2716 Blake StOct 8, 2024New uncovered concrete decking pool and pool equipment pad · 90 m away
- 10209 Beard AveAug 10, 2026Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 2627 Gwendolyn LnOct 20, 2026Replacement of an existing water heater 40 gal water heater change out 2627 gwendolyn lane b austin tx 78748 · 146 m away
- 2609 Tinmouth StSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 148 m away
- 10229 Beard AveMar 28, 2025Replacement of complete existing central heat and air system with or without duct work fixd job: 78059 de leon · 158 m away
- 2805 Blake StJun 10, 2026This estimate outlines the scope of work required to address multiple failures in the drain system servicing the hall bathroom. upon return centex will perform approximately 25 feet of tunneling beneath the foundation to gain access to the damaged section of the 3 main drain line serving the hall bathroom. during initial evaluation multiple leaks were identified including two leaks on the main line and two additional leaks at the lavatory and tub drain connections indicating widespread failure of the existing drainage system. due to the condition of the piping the recommended course of action is to fully re-pipe the hall bathroom drain system rather than attempt isolated repairs. this will ensure long-term reliability and bring the system up to current standards. all necessary piping within the hall bathroom area will be fully exposed and replaced including connections to the lavatory and tub drains as well as the affected section of the main line. once all repairs and re-piping are completed we will: perform a full system test to verify proper function and confirm there are no remaining leaks coordinate and schedule required city inspection to ensure compliance with local plumbing codes · 161 m away
- 2804 Tinmouth StApr 28, 2026Ev charger installation · 175 m away
- 10237 Beard AveJul 9, 2024Replacement of an existing water heater · 176 m away
- 10308 Beard AveJan 27, 2025Express: foundation repair- installing 13 exterior pilings · 185 m away