Water and sewer line repairs at 325 Middle Ground Cv

A plumbing permit filed Feb. 4, 2026, describes an access hole and 10 feet of tunneling to repair an existing sewer line, along with inspection of a copper water-line repair at the garage floor. An earlier permit filed Dec. 3, 2024, covered access to repair a water leak and 25 square feet of slab repair. The 2026 permit is listed as expired; the 2024 permit is final.

Summarized from City of Austin records · updated Feb 4, 2026

Projects
2
2 filings
Latest filing
Feb 4, 2026
since Dec 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

1 access hole in dirt 10 feet of tunnel to repair existing sewer line 2/6/26 ls only inspected copper water line repair at garage floor. concrete was removed and short tunnel excavated

  1. AppliedFeb 3, 2026
  2. IssuedFeb 4, 2026
  3. !WorkFeb '26 – Aug '26
  4. Final inspection

Marked expired Aug 6, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 1 access hole in dirt 10 feet of tunnel to repair existing sewer line 2/6/26 ls only inspected copper water line repair at garage floor. concrete was removed and short tunnel excavated

    1 access hole in dirt 10 feet of tunnel to repair existing sewer line 2/6/26 ls only inspected copper water line repair at garage floor. concrete was removed and short tunnel excavated

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. One access hole under 5 foot tunnel to repair water leak. water repair with an interior access not drain lines. leak in the living room no tunnel under slab in the slab 25 sq ft of slab repair

    One access hole under 5 foot tunnel to repair water leak. water repair with an interior access not drain lines. leak in the living room no tunnel under slab in the slab 25 sq ft of slab repair

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 325 Middle Ground Cv

What work is happening at 325 Middle Ground Cv in Austin?

City of Austin plumbing permits describe repairs to existing water and sewer lines, including tunneling and slab repair. The latest permit, filed Feb. 4, 2026, is listed as expired.

Is a new home being built at 325 Middle Ground Cv?

The available permits describe plumbing repairs at a residential property, not construction of a new home.

Is the sewer line being repaired at 325 Middle Ground Cv?

The Feb. 4, 2026, permit (2026-013089 PP) describes an access hole and 10 feet of tunneling to repair an existing sewer line.

What was the 2024 permit for at 325 Middle Ground Cv?

Permit 2024-152419 PP, filed Dec. 3, 2024, covered access to repair a water leak and 25 square feet of slab repair. Its status is listed as final.

Is the latest plumbing permit at 325 Middle Ground Cv still active?

No. The City of Austin lists permit 2026-013089 PP, filed Feb. 4, 2026, as expired.

Also being built nearby

All of 78748
Email me when a new permit is filed