420 W Slaughter Ln
Austin, TX 78748
Four Tesla EV chargers permitted at 420 W Slaughter Ln
Permits indicate four pedestal-mounted Tesla Gen 3 48-amp wall connectors, four bollards and two signs are being installed at 420 W Slaughter Ln. The building permit was filed March 20, 2026, and the electrical permit followed on March 26.
Summarized from City of Austin records · updated Mar 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 26, 2026
- since Mar 20, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstall (4) tesla gen 3 wall connector 48a ev charger pedestal mounted install (4) bollards install (2) signs
- AppliedMar 6, 2026
- IssuedMar 26, 2026
- WorkMar '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall (4) tesla gen 3 wall connector 48a ev charger pedestal mounted install (4) bollards install (2) signs
Install (4) tesla gen 3 wall connector 48a ev charger pedestal mounted install (4) bollards install (2) signs
City of Austin permitElectrical PermitActive- Record
- 2026-033607 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install (4) tesla gen 3 wall connector 48a ev charger pedestal mounted install (4) bollards install (2) signs
Install (4) tesla gen 3 wall connector 48a ev charger pedestal mounted install (4) bollards install (2) signs
City of Austin permitBuilding PermitActive- Record
- 2026-033607 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 420 W Slaughter Ln
What is being installed at 420 W Slaughter Ln?
Permits indicate four pedestal-mounted Tesla Gen 3 48-amp wall connectors, four bollards and two signs. The City of Austin building and electrical permits were filed March 20 and March 26, 2026.
Are EV chargers being installed at 420 W Slaughter Ln in Austin?
Yes. City of Austin permits cover the installation of four Tesla Gen 3 wall connector EV chargers at the address.
How many EV chargers are planned at 420 W Slaughter Ln?
The permit descriptions specify four pedestal-mounted Tesla Gen 3 48-amp wall connectors.
When were the permits filed for the chargers at 420 W Slaughter Ln?
The building permit, 2026-033607 BP, was filed March 20, 2026. The electrical permit, 2026-033607 EP, was filed March 26, 2026.
What do the permits say will be added besides the chargers?
The descriptions also specify four bollards and two signs.
Also being built nearby
All of 78748- 420 Slaughter LnSep 29, 2026Waterstone multi-family (smart housing project)
- 9016 Swanson LnApr 15, 2026Express: foundation repair · 121 m away
- 510 Slaughter LnMar 2, 2007Whataburger · 152 m away
- 605 Natali StNov 2, 2026Replace 50 gallon natural gas tank-type with 199k btu natural gas tankless water heater · 169 m away
- 505 Slaughter LnMar 31, 2008H20 carwash · 176 m away
- 8925 Swanson LnDec 3, 2025Express- remove existing siding and fascia install new james hardie panel siding trim and fascia. replace damaged sheathing or install new sheathing if not present behind siding. install new tyvek flashing caulking and paint exterior. no structural · 179 m away
- 8921 Swanson LnJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 183 m away
- 520 Slaughter LnMar 2, 2007Cvs pharmacy s. 1st street and slaughter · 184 m away
- 509 Slaughter LnJun 6, 2012Rosa's cafe · 185 m away
- 408 Slaughter LnMar 2, 2007Autoway · 189 m away
- 501 Slaughter LnMar 2, 2007South park retail · 196 m away
- 8909 Swanson LnApr 10, 2025Enclose existing covered patio with sunroom addition · 198 m away