Permits cover a generator and gas line at 728 Minturn Ln
Austin permits cover installation of a new Generac generator and service-rated transfer switch at 728 Minturn Ln, followed by a new gas line for the generator. The electrical permit was filed September 15, 2026, and the plumbing permit was filed October 7, 2026; both are marked final.
Summarized from City of Austin records · updated Oct 7, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Oct 7, 2026
- since Sep 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new gas line for generator
- AppliedOct 4, 2026
- IssuedOct 7, 2026
- WorkOct '26 – Oct '26
- Final inspectionOct 12, 2026
Passed final inspection Oct 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new gas line for generator
Install new gas line for generator
City of Austin permitPlumbing PermitFinal- Record
- 2026-130417 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of new generac generator and service rated transfer switch austin energy disconnect will be needed ( jorge arriagada)
Installation of new generac generator and service rated transfer switch austin energy disconnect will be needed ( jorge arriagada)
City of Austin permitElectrical PermitFinal- Record
- 2026-118611 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 728 Minturn Ln
What is happening at 728 Minturn Ln in Austin?
Austin permits cover installing a new Generac generator and service-rated transfer switch, plus a gas line for the generator. The permits were filed September 15 and October 7, 2026.
Is a new generator being installed at 728 Minturn Ln?
Yes. Electrical permit 2026-118611 EP, filed September 15, 2026, describes installation of a new Generac generator and service-rated transfer switch.
What is the gas line permit for at 728 Minturn Ln?
Plumbing permit 2026-130417 PP covers installing a new gas line for the generator. It was filed October 7, 2026, and is marked final.
When were permits filed for work at 728 Minturn Ln?
The electrical permit was filed September 15, 2026, and the plumbing permit was filed October 7, 2026. Both are marked final.
What are the permit numbers for the generator work at 728 Minturn Ln?
The electrical permit is 2026-118611 EP, and the plumbing permit for the generator’s gas line is 2026-130417 PP.
Is the work at 728 Minturn Ln a new building project?
The records describe installation of a generator, transfer switch, and gas line. They do not describe construction of a new building.
Also being built nearby
All of 78748- 730 Minturn LnJun 29, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system through austin energys home energy savings program · 19 m away
- 8622 Croydon LoopFeb 19, 2025Emergency 30ft water line repair · 62 m away
- 8614 Croydon LoopMar 6, 2026Replacement of an existing water heater replace 50-gallon gas water heater location: garage closet · 75 m away
- 8709 Palace PkwyOct 9, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 721 Minturn LnDec 16, 2025Express- remove old siding and replace with new siding · 93 m away
- 8805 Palace PkwyMar 19, 2024Replacement of complete existing central heat and air system with or without duct work · 103 m away
- 8613 Croydon LoopMay 6, 2026Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 8612 Ruddington DrAug 13, 2026Replacement of complete existing central heat and air system with or without duct work gran · 115 m away
- 738 Simonetti DrDec 12, 2024Replacement of complete existing central heat and air system with or without duct work replace the a/c system and add 3 ducts. work to be performed on b side of duplex · 126 m away
- 8703 Palace PkwySep 12, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 8766 Birmingham DrOct 27, 2025Excavate 35 tunnel to repair main drain line under house · 131 m away
- 8701 Palace PkwyOct 23, 2026Replace approximately 60 linear feet of existing underground water service line from the street-side connection to the house including trenching in the front yard and removal of up to 5 linear feet of driveway concrete. repipe the entire homes water distribution system with pex routed through the attic. work includes piping for two bathrooms one kitchen one ice maker box one washing machine connection and one water heater plus new fixture shutoff valves and three hose bibs. replace the existing water heater and correct installation deficiencies. install a new drain pan with drain piping to the exterior temperature and pressure relief discharge piping and a thermal expansion tank. pressure test new water piping and complete required inspections · 145 m away