groundranger
Recent · latest filing Jul 2026Residential

8111 Boggy Ridge Dr

Austin, TX 78748

Siding replacement permitted at 8111 Boggy Ridge Dr

A City of Austin permit indicates siding will be removed and reinstalled at 8111 Boggy Ridge Dr, with no other changes listed. The active permit, 2026-090752 BP, was filed July 14, 2026.

Summarized from City of Austin records · updated Jul 14, 2026

Projects
1
1 filings
Latest filing
Jul 14, 2026
since Jul 14, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Express- remove and reinstall siding. no other changes. will need electrical permit to temporarily shut off power to replace siding behind electrical

  1. AppliedJul 14, 2026
  2. IssuedJul 14, 2026
  3. WorkJul '26 – Jan '27
  4. Final inspection
71% through of the permit windowJul 14, 2026 → Jan 11, 2027

2 contacts on this project · 2 phone numbers

Permit & project history

1 project
  1. Express- remove and reinstall siding. no other changes. will need electrical permit to temporarily shut off power to replace siding behind electrical

    Express- remove and reinstall siding. no other changes. will need electrical permit to temporarily shut off power to replace siding behind electrical

    City of Austin permitBuilding PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 8111 Boggy Ridge Dr

What work is planned at 8111 Boggy Ridge Dr?

The permit describes removing and reinstalling siding, with no other changes. It also notes that an electrical permit will be needed to temporarily shut off power while replacing siding behind electrical equipment.

When was the siding permit filed?

The City of Austin permit was filed July 14, 2026. Its permit number is 2026-090752 BP.

Is this a new home construction project?

The permit describes siding removal and reinstallation, not new home construction.

What is the permit status for 8111 Boggy Ridge Dr?

The City of Austin lists permit 2026-090752 BP as active. It was filed July 14, 2026.

Does the permit include other changes to the home?

No other changes are listed in the permit description. It specifies siding removal and reinstallation.

Also being built nearby

All of 78748
Email me when it passes final inspection