900 Angleton Cv
Austin, TX 78748
900 Angleton Cv: 1 project on record
City of Austin lists 1 filing across 1 project at 900 Angleton Cv, Austin, TX 78748. The most recent, filed July 19, 2025, covers: “Ev install”.
Compiled from City of Austin records · updated Jul 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 19, 2025
- since Jul 19, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectEv install
Ev install
City of Austin permitElectrical PermitFinal- Record
- 2025-088750 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 900 Angleton Cv
What is being built at 900 Angleton Cv?
The latest filing (City of Austin permit 2025-088750 EP, July 19, 2025) covers ev install.
How many permits and filings does 900 Angleton Cv have?
1 filing across 1 project, from July 19, 2025 to July 19, 2025.
Is there other construction near 900 Angleton Cv?
Yes. Nearby filings include 10400 Sentenal Dr (replacement of an existing water heater, Dec 4, 2024); 10402 Sentenal Dr (total demolition of unfinished adu 780 sq ft, Apr 17, 2024); 811 Silcantu Dr (replacement of an existing water heater replacing gas tank water heater with similar model, Jul 28, 2026).
How do I get alerts for new permits at 900 Angleton Cv?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 10400 Sentenal DrDec 4, 2024Replacement of an existing water heater · 50 m away
- 10402 Sentenal DrApr 17, 2024Total demolition of unfinished adu 780 sq ft · 66 m away
- 811 Silcantu DrJul 28, 2026Replacement of an existing water heater replacing gas tank water heater with similar model · 86 m away
- 803 Angleton CvSep 29, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 911 Silcantu DrSep 20, 2024Replacement of an existing water heater · 100 m away
- 10408 Bilbrook PlJul 8, 2026Express: install 5 helical piers · 108 m away
- 10419 Bilbrook PlAug 19, 2025Installing circuit for ev charging · 108 m away
- 805 Silcantu DrJan 12, 2026Replacement of mini-split system install 12k btu inverter daikin mini-split system. rxc heat pump condenser and ftxc air handler · 120 m away
- 738 Shade Tree DrJul 31, 2024Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 742 Shade Tree DrJun 19, 2024Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 10400 Bilbrook PlDec 24, 2025Express: replace 14 windows like for like replace two doors like for like (exempt) · 143 m away
- 10507 Bilbrook PlJun 11, 2025Replacement of complete existing central heat and air system with or without duct work · 156 m away