9000 Alex Ln
Austin, TX 78748
9000 Alex Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 9000 Alex Ln, Austin, TX 78748. The most recent, filed August 9, 2017, covers: “The reserve at southpark meadow ii, phase 3b & 3c”.
Compiled from City of Austin records · updated Aug 9, 2017
- Projects
- 1
- 1 filings
- Latest filing
- Aug 9, 2017
- since Aug 9, 2017
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 9000 Alex Ln
What is being built at 9000 Alex Ln?
The latest filing (City of Austin case 11613526, August 9, 2017) covers the reserve at southpark meadow ii, phase 3b & 3c.
How many permits and filings does 9000 Alex Ln have?
1 filing across 1 project, from August 9, 2017 to August 9, 2017.
Is there other construction near 9000 Alex Ln?
Yes. Nearby filings include 9209 Alex Ln (install evse, Apr 23, 2025); 9105 Alex Ln (replacement of complete existing central heat and air system with or without duct work, Aug 28, 2026); 9305 Alex Ln (install new 0.83kw rooftop solar system for existing residential only, Feb 13, 2025).
How do I get alerts for new permits at 9000 Alex Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9209 Alex LnApr 23, 2025Install evse · 46 m away
- 9105 Alex LnAug 28, 2026Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 9305 Alex LnFeb 13, 2025Install new 0.83kw rooftop solar system for existing residential only · 91 m away
- 9313 Alex LnJul 8, 2025(gong iris) - installation of circuit for elec. vehicle charging station - esip · 116 m away
- 501 Slaughter LnMar 2, 2007South park retail · 130 m away
- 8000 Alex LnNov 16, 2017Amended plat of lots 27-46 block a and lots 19-29 block b reserve at south park meadows · 134 m away
- 415 Slaughter LnApr 22, 2013Southpark meadows ii luby's · 140 m away
- 9204 Bentley Garner LnApr 21, 2026Express: tub and shower to shower replacement (prefab base) in the same location · 143 m away
- 405 Slaughter LnSep 17, 2012Spm commercial phase 4 subdivision; amended plat of lots 2 & 3, block a · 153 m away
- 9212 Bentley Garner LnApr 4, 2025Upgrading to a 200amp service and panel. no meter can replacement needed. will run new wire from existing meter to the new service panel · 163 m away
- 9313 Margaret Jewel LnSep 9, 2024Installation of roof mounted solar panels. existing 150amp main breaker · 163 m away
- 505 Slaughter LnMar 31, 2008H20 carwash · 167 m away