9204 Sedgemoor Trl
Austin, TX 78748
Foundation repair permitted at 9204 Sedgemoor Trl
A foundation repair at 9204 Sedgemoor Trl was permitted on July 13, 2026. The City of Austin permit describes 23 press-piling pier locations along the slab foundation’s perimeter and three locations to be broken through and patched; the permit status is Final.
Summarized from City of Austin records · updated Jul 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 13, 2026
- since Jul 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair on a slab foundation. we intend to install 23 total press piling pier locations along the perimeter. there will be 3 breakthrough and patched locations. we will improve levet
- AppliedJul 9, 2026
- IssuedJul 13, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 7, 2026
Passed final inspection Aug 7, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair on a slab foundation. we intend to install 23 total press piling pier locations along the perimeter. there will be 3 breakthrough and patched locations. we will improve levet
Express: foundation repair on a slab foundation. we intend to install 23 total press piling pier locations along the perimeter. there will be 3 breakthrough and patched locations. we will improve levet
City of Austin permitBuilding PermitFinal- Record
- 2026-088337 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9204 Sedgemoor Trl
What is being built at 9204 Sedgemoor Trl?
The City of Austin permit is for foundation repair, not a new building. It describes 23 press-piling pier locations around the perimeter of the slab foundation and three locations to be broken through and patched.
When was the foundation repair at 9204 Sedgemoor Trl permitted?
The permit was filed July 13, 2026. Its status is Final.
What is the permit number for 9204 Sedgemoor Trl?
The City of Austin permit number is 2026-088337 BP, filed July 13, 2026.
How many piers are planned at 9204 Sedgemoor Trl?
The permit describes 23 press-piling pier locations along the slab foundation’s perimeter.
Is 9204 Sedgemoor Trl getting a new house?
The record describes foundation repair on a slab foundation, not construction of a new house. It was filed as City of Austin permit 2026-088337 BP on July 13, 2026.
What does the 9204 Sedgemoor Trl permit cover?
It covers foundation repair, including 23 press-piling pier locations around the perimeter and three breakthrough-and-patch locations. The permit status is Final.
Also being built nearby
All of 78748- 9219 Kempler DrJan 23, 2024Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 9120 Sedgemoor TrlJun 17, 2026Express: foundation repair · 65 m away
- 9215 Kempler DrSep 26, 2024Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 9211 Kempler DrMar 5, 2025Express: foundation repair · 92 m away
- 9209 Kempler DrFeb 2, 2024Ev install · 111 m away
- 9125 Menchaca RdOct 13, 2010Blatt veterinary clinic · 143 m away
- 9205 Kempler DrAug 20, 2026Express: foundation repair · 145 m away
- 9304 Doliver DrFeb 20, 2024Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 9313 Kempler DrJan 17, 2024Replacement of complete existing central heat and air system with or without duct work · 159 m away
- 9115 Japonica CtJul 16, 2026Replacement of complete existing central heat and air system with or without duct work replace like-for-like 2-ton split gas electric system. no ductwork modifications · 165 m away
- 2208 Toulouse DrJun 12, 2024Whole home repipe and installation of 40 ft of new waterline in up to 1 pex insulated in necessary · 166 m away
- 9307 Doliver DrJul 17, 2026Replacement of an existing water heater removal and disposal of the existing 40-gallon natural gas water heater located in the garage and installation of a new professional-grade 40-gallon natural gas water heater. all work will be completed in accordance with current plumbing and fuel gas codes · 168 m away