9511 Brodie Lane
Austin, TX 78748 · Headwaters School
Headwaters School registered a 1,410-square-foot portable
A new 1,410-square-foot portable for Headwaters School was registered with the Texas Department of Licensing and Regulation on June 18, 2024. The applicant estimated the project cost at $260,000; the TDLR record lists the project as closed.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2024
- since Jun 18, 2024
- Largest scope
- 1,410 sf
- Estimated cost
- $260K
- state registration
Where this project stands
CompletedHeadwaters Portable
1,410 sq ft · $260K est.
- RegisteredJun 18, 2024
- Plan review
- ConstructionJul '24 – Aug '24
- Inspected
- Closed
Ran as a 1-month build.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectNew portable — headwaters portable
TDLR project registrationNew ConstructionProject Closed1,410 sq ft$260K est.- Project #
- TABS2024021066
- Tenant / owner
- Headwaters Portable
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 9511 Brodie Lane
What is being built at 9511 Brodie Lane in Austin?
A 1,410-square-foot portable for Headwaters School was registered as new construction. The TDLR record lists the project as closed.
When was the Headwaters portable project registered?
The project was registered with the Texas Department of Licensing and Regulation on June 18, 2024.
How large is the new portable at 9511 Brodie Lane?
The TDLR registration lists the portable at 1,410 square feet.
How much is the Headwaters portable project estimated to cost?
The applicant estimated the project cost at $260,000. This is an estimate for the project, not a reported final cost.
Is Headwaters School building a new classroom at 9511 Brodie Lane?
The TDLR record describes a new portable for Headwaters School, but does not specify its use as a classroom.
Also being built nearby
All of 78748- 9511 Brodie LnAug 21, 2024Temporary portable for education · 59 m away
- 9417 Brodie LnMar 2, 2007Phs-brodie lane · 62 m away
- 9405 Brodie LnMar 2, 2007Stepping stone school · 126 m away
- 9400 Brodie LnDec 21, 2007Brodie 31 subdivision phase 3 — brodie 31 subdivision phase 3 · 141 m away
- 9607 Brodie LnDec 23, 2013Khabele school · 175 m away
- 9312 Brodie LnAug 22, 2013First choice er · 207 m away
- 9502 Tea Rose TrlApr 17, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 242 m away
- 9701 Brodie LnFeb 5, 2009Sandahl-brodie sec 2 amended, resubdivision of — sandahl-brodie subdivision sec 2, resubdivision of amended · 242 m away
- 9300 Brodie LnMar 16, 2011Brodie lane storage · 248 m away
- 9510 Tea Rose TrlApr 16, 2026New irrigation install to full yard front and back · 249 m away
- 9505 Tea Rose TrlAug 15, 2025Replacement of an existing water heater replace 50gal gas water heater · 275 m away
- 9300 Silk Oak CvSep 10, 2024Replacement of complete existing central heat and air system with or without duct work · 298 m away