9605 Alex Ln
Austin, TX 78748
9605 Alex Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 9605 Alex Ln, Austin, TX 78748. The most recent, filed March 18, 2024, covers: “Irrigation system installation”.
Compiled from City of Austin records · updated Mar 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 18, 2024
- since Mar 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIrrigation system installation
- AppliedMar 13, 2024
- IssuedMar 18, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 9, 2024
Passed final inspection Apr 9, 2024.
Permit & project history
1 projectIrrigation system installation
Irrigation system installation
City of Austin permitPlumbing PermitFinal- Record
- 2024-031524 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9605 Alex Ln
What is being built at 9605 Alex Ln?
The latest filing (City of Austin permit 2024-031524 PP, March 18, 2024) covers irrigation system installation.
How many permits and filings does 9605 Alex Ln have?
1 filing across 1 project, from March 18, 2024 to March 18, 2024.
Is there other construction near 9605 Alex Ln?
Yes. Nearby filings include 9713 Alex Ln (replacement of complete existing central heat and air system with or without duct work, Jul 21, 2025); 9600 Sawyer Fay Ln (express: install 22 push piers, Jan 14, 2026); 9704 Alex Ln (tankless install, Dec 26, 2023).
How do I get alerts for new permits at 9605 Alex Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78748- 9713 Alex LnJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 9600 Sawyer Fay LnJan 14, 2026Express: install 22 push piers · 81 m away
- 9704 Alex LnDec 26, 2023Tankless install · 100 m away
- 9520 Sawyer Fay LnOct 24, 2025Disconnect for installation of a 14.685kw solar panel system with 2 powerwall 3s. shutdown needed for powerwall installation · 101 m away
- 9708 Alex LnJul 26, 2024Installation of new dedicated gfci protected 60 amp circuit with #4/3 romex to feed and install a customer supplied telsa wall connector on left interior garage wall circuit fed from exterior main 125 amp panel on right side of home through attic and down wall · 104 m away
- 9724 Alex LnApr 17, 2026Replacement of complete existing central heat and air system with or without duct work · 135 m away
- 9532 Hunter LnAug 19, 2024Replacement of complete existing central heat and air system with or without duct work · 151 m away
- 312 Braylen CvAug 28, 2025Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 325 Jack Ryan LnApr 8, 2024(hernandez rodney) - installation of circuit for elec. vehicle charging station - esip · 185 m away
- 9516 Hunter LnJun 9, 2026Request to disconnect - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. ** customer says this is the main service panel to 200 amps but we are not touching the meter no meter work being performed · 189 m away
- 9800 Milla CirDec 10, 2025Replacement of an existing water heater 40gal gas water heater changeout · 194 m away
- 801 Taft LnNov 25, 2014Spm block a lot 28; resubdivision · 196 m away