8.7 kW rooftop solar at 9710 Holly Springs Dr

Two Austin electrical permits filed April 10, 2025, indicate an 8.7 kW rooftop solar installation at the existing residence. The permits also cover tying in the solar system and upgrading the electrical service to 200 amps; both are marked final.

Summarized from City of Austin records · updated Apr 10, 2025

Projects
2
2 filings
Latest filing
Apr 10, 2025
since Apr 10, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Petersen - install new _8.7__kw rooftop solar system to existing residential only using backfed breaker

  1. AppliedApr 8, 2025
  2. IssuedApr 10, 2025
  3. WorkApr '25 – Dec '25
  4. Final inspectionJul 25, 2025

Passed final inspection Jul 25, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Petersen - install new _8.7__kw rooftop solar system to existing residential only using backfed breaker

    Petersen - install new _8.7__kw rooftop solar system to existing residential only using backfed breaker

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Petersen - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. (upgrading revenue meter to 200 amps.)

    Petersen - disconnect/reconnect power to tie in pv component and upgrading msp to _200__ amps. _200__ main breaker. (upgrading revenue meter to 200 amps.)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9710 Holly Springs Dr

What is being built at 9710 Holly Springs Dr?

Austin permits indicate an 8.7 kW rooftop solar system is being installed at the existing residence, along with electrical service upgrades.

Is a new house being built at 9710 Holly Springs Dr?

The April 10, 2025 permits describe work at an existing residence, not construction of a new house.

When was the solar work permitted at 9710 Holly Springs Dr?

The two Austin electrical permits were filed April 10, 2025. Both are marked final.

What size solar system is planned for 9710 Holly Springs Dr?

The permit description specifies a new 8.7 kW rooftop solar system.

Is the electrical service being upgraded at 9710 Holly Springs Dr?

Yes. Permit 2025-042676 EP describes tying in the photovoltaic system and upgrading the service and main breaker to 200 amps.

Also being built nearby

All of 78748

More solar installs in 78748.

Email me when a new permit is filed