Rooftop solar and battery storage permitted at 9818 Briar Ridge

Austin permits filed September 5, 2025, cover an 8.925 kW rooftop solar system and 13.5 kW energy storage system for the existing residence at 9818 Briar Ridge Dr. A separate permit covers disconnecting and reconnecting the electrical service to upgrade the main distribution panel. Both permits are listed as final.

Summarized from City of Austin records · updated Sep 5, 2025

Projects
2
2 filings
Latest filing
Sep 5, 2025
since Sep 5, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Disconnect/reconnect to upgrade main distribution panel

  1. AppliedSep 4, 2025
  2. IssuedSep 5, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 2, 2025

Passed final inspection Oct 2, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Disconnect/reconnect to upgrade main distribution panel

    Disconnect/reconnect to upgrade main distribution panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 8.925 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    Install new 8.925 kw rooftop solar system and 13.5 kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 9818 Briar Ridge Dr

What is being installed at 9818 Briar Ridge Dr?

An Austin permit covers an 8.925 kW rooftop solar system and 13.5 kW energy storage system for the existing residence. The permit was filed September 5, 2025, and is listed as final.

Is a new home being built at 9818 Briar Ridge Dr?

The solar permit describes work for an existing residence only. The records do not indicate a new home being built.

Are there electrical upgrades at 9818 Briar Ridge Dr?

Yes. A permit filed September 5, 2025, covers disconnecting and reconnecting the electrical service to upgrade the main distribution panel. It is listed as final.

How much solar capacity is planned for 9818 Briar Ridge Dr?

The permit describes a new 8.925 kW rooftop solar system. It also includes a 13.5 kW energy storage system.

When were the solar and electrical permits filed for 9818 Briar Ridge Dr?

Both City of Austin electrical permits were filed September 5, 2025. The solar and storage permit is 2025-111076 EP, and the main distribution panel upgrade permit is 2025-112215 EP.

Also being built nearby

All of 78748

More warehouses & industrial in 78748, solar installs in 78748.

Email me when a new permit is filed