Drain repairs and window replacement at 9904 Woodshire Dr
City of Austin permits indicate work at this residence includes tunnels to repair broken drains beneath the foundation and replacement of two existing windows. The window permit was filed June 13, 2025, and the plumbing permit was filed May 26, 2026.
Summarized from City of Austin records · updated May 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 26, 2026
- since Jun 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled12ft and 7ft tunnels to repair broken drains under foundation
- AppliedMay 21, 2026
- IssuedMay 26, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 22, 2026
Passed final inspection Jun 22, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projects12ft and 7ft tunnels to repair broken drains under foundation
12ft and 7ft tunnels to repair broken drains under foundation
City of Austin permitPlumbing PermitFinal- Record
- 2026-064870 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: replace 2 existing windows
Express: replace 2 existing windows
City of Austin permitBuilding PermitFinal- Record
- 2024-022419 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9904 Woodshire Dr
What work is permitted at 9904 Woodshire Dr?
City permits list replacement of two existing windows and 12-foot and 7-foot tunnels to repair broken drains under the foundation.
When was the drain repair permitted at 9904 Woodshire Dr?
The City of Austin plumbing permit, 2026-064870 PP, was filed May 26, 2026. Its status is listed as Final.
When were the windows at 9904 Woodshire Dr permitted for replacement?
The City of Austin building permit, 2024-022419 BP, was filed June 13, 2025. It covers replacement of two existing windows and is listed as Final.
Is a new home being built at 9904 Woodshire Dr?
The records provided show permits for window replacement and drain repairs under the foundation, not a new home construction project.
What do the tunnels at 9904 Woodshire Dr repair?
The May 26, 2026 plumbing permit describes 12-foot and 7-foot tunnels to repair broken drains under the foundation.
Also being built nearby
All of 78748- 9902 Woodshire DrApr 16, 2024Excavate 40 tunnel to repair main line to bathroom line · 17 m away
- 9911 Willers WayMay 22, 2025Replacement of complete duct system only · 34 m away
- 9913 Willers WayFeb 25, 2025Express: foundation repair · 39 m away
- 9907 Willers WayJan 17, 2025Express: remove and replace 12 windows (like for like) · 44 m away
- 9815 Woodshire DrJun 18, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton gas system · 74 m away
- 9913 Woodshire DrApr 4, 2025Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 9906 Willers WayAug 13, 2026Express: foundation repair revision-repair to broken sewer line under home via tunnel · 89 m away
- 9902 Willers WayNov 17, 2025Main breaker box and meter replacement · 108 m away
- 9905 Briar Ridge DrMar 3, 2026Per 2025-155036 pp 1. need to pull electric permit for new water heater circuit. 2. new water heater circuit shall be dedicated for water heater · 132 m away
- 9809 Willers WayNov 18, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 3-ton vertical gas split hvac system · 135 m away
- 9903 Briar Ridge DrDec 21, 2023Upgrade electrical service · 139 m away
- 9806 Willers WayJun 3, 2026Replacement of mini-split system install replacement of 9k btu mini-split system · 160 m away