3716 Holt Dr
Austin, TX 78749
3716 Holt Dr: 7 projects on record
City of Austin lists 7 filings across 7 projects at 3716 Holt Dr, Austin, TX 78749 since April 15, 2024. The most recent, filed August 21, 2025, covers: “Interior remodel of existing sfr”.
Compiled from City of Austin records · updated Aug 21, 2025
- Projects
- 7
- 7 filings
- Latest filing
- Aug 21, 2025
- since Apr 15, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel of existing sfr
- AppliedJul 25, 2025
- IssuedAug 21, 2025
- WorkAug '25 – Dec '25
- Final inspectionDec 2, 2025
Passed final inspection Dec 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
7 projectsInterior remodel of existing sfr
Interior remodel of existing sfr
City of Austin permitElectrical PermitFinal- Record
- 2025-100102 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of existing sfr
Interior remodel of existing sfr
City of Austin permitMechanical PermitFinal- Record
- 2025-100102 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of existing sfr
Interior remodel of existing sfr
City of Austin permitPlumbing PermitFinal- Record
- 2025-100102 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of existing sfr
Interior remodel of existing sfr
City of Austin permitBuilding PermitFinal- Record
- 2025-100102 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install circuit for level 2 evse
Install circuit for level 2 evse
City of Austin permitElectrical PermitFinal- Record
- 2024-044933 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Towns/geubtner - msp upgrade - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
Towns/geubtner - msp upgrade - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps
City of Austin permitElectrical PermitFinal- Record
- 2023-072842 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Towns - install new 5.475kw rooftop solar system to existing residential only using backfed breaker
Towns - install new 5.475kw rooftop solar system to existing residential only using backfed breaker
City of Austin permitElectrical PermitFinal- Record
- 2023-066417 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3716 Holt Dr
What is being built at 3716 Holt Dr?
The latest filing (City of Austin permit 2025-100102 EP, August 21, 2025) covers interior remodel of existing sfr.
How many permits and filings does 3716 Holt Dr have?
7 filings across 7 projects, from April 15, 2024 to August 21, 2025.
Is there other construction near 3716 Holt Dr?
Yes. Nearby filings include 7600 Wordham Dr (8.3 kw solar install on an existing residential roof with a 10 kwh battery backup system, Nov 13, 2025); 3706 Harpers Ferry Ln (pressure regulator valve and homeowner shutoff valve installed in the yard, Aug 21, 2026); 3806 Holt Dr (run 6 of 1 black iron pipe to generator, Sep 15, 2026).
How do I get alerts for new permits at 3716 Holt Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 7600 Wordham DrNov 13, 20258.3 kw solar install on an existing residential roof with a 10 kwh battery backup system · 69 m away
- 3706 Harpers Ferry LnAug 21, 2026Pressure regulator valve and homeowner shutoff valve installed in the yard · 99 m away
- 3806 Holt DrSep 15, 2026Run 6 of 1 black iron pipe to generator · 105 m away
- 7603 Melville CvJul 28, 2026Express: replace 9 windows like for like · 111 m away
- 3702 Holt DrJul 2, 2024Existing bathroom and closet to be remodeled into a primary bathroom fixtures to be relocated tub becomes shower and toilet new windows added · 124 m away
- 7605 Melville CvAug 7, 2026Express: replace 8 existing windows - size for size replace 1 existing sliding glass door - size for size · 127 m away
- 7608 Wordham DrJan 23, 2026Ran gas pipe aproximentally 15 foot from attic spacing to new range location · 133 m away
- 7611 Wordham DrOct 30, 2026Upgrade main service · 138 m away
- 3810 Holt DrFeb 1, 2024Update elec service meter panel grounding intersystem surge · 145 m away
- 3701 Harpers Ferry LnOct 28, 2026Base: installing a backup battery system and additional meter socket · 156 m away
- 7701 Wordham DrNov 4, 2024150amp service upgrade · 177 m away
- 3911 Kandy DrDec 17, 2024Replacement of complete existing central heat and air system with or without duct work · 197 m away