3812 Sawmill Dr
Austin, TX 78749
HVAC system and water heater replacements at 3812 Sawmill Dr
City of Austin permits show replacement of an existing water heater on June 27, 2025, and a like-for-like replacement of the home's central heating and air system on May 26, 2026. The records describe residential equipment replacements, not new construction.
Summarized from City of Austin records · updated May 26, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 26, 2026
- since Jun 27, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replacing like for like 4t horizontal gas system
- AppliedMay 21, 2026
- IssuedMay 26, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 11, 2026
Passed final inspection Jun 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work replacing like for like 4t horizontal gas system
Replacement of complete existing central heat and air system with or without duct work replacing like for like 4t horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2026-064535 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2025-076385 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3812 Sawmill Dr
What is being built at 3812 Sawmill Dr?
The City of Austin records show replacement of an existing water heater and central heating and air system. They do not describe a new building.
Was a new home permitted at 3812 Sawmill Dr?
The permits listed for this address concern equipment replacements, not construction of a new home.
When was the HVAC replacement permitted at 3812 Sawmill Dr?
The mechanical permit was filed May 26, 2026. Permit 2026-064535 MP describes a like-for-like replacement of the existing central heat and air system.
Was a water heater replacement permitted at 3812 Sawmill Dr?
Yes. Plumbing permit 2025-076385 PP, filed June 27, 2025, covers replacement of an existing water heater.
What does permit 2026-064535 MP cover?
It covers replacement of the complete existing central heat and air system, with or without duct work, using a like-for-like 4-ton horizontal gas system. The permit is listed as final.
Are there active construction permits at 3812 Sawmill Dr?
The two listed City of Austin permits are both marked final: the water heater permit filed June 27, 2025, and the mechanical permit filed May 26, 2026.
Also being built nearby
All of 78749- 3816 Sawmill DrJun 23, 2025Replacement of complete existing central heat and air system with or without duct work · 21 m away
- 3808 Sawmill DrOct 7, 2026Replacement of an existing water heater 50g gas water heater replacement · 23 m away
- 3820 Sawmill DrJan 22, 2024Greenlee - install new 11.31kw rooftop solar system to existing residential only using a back fed breaker · 41 m away
- 3721 Malone DrJun 24, 2024Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 3712 Sawmill DrApr 30, 2026Express: replace 5 windows (like for like) · 87 m away
- 3900 Sawmill DrMay 20, 2024Attached pergola addition · 92 m away
- 3713 Malone DrAug 8, 2025Replacement of complete existing central heat and air system with or without duct work residential full changeout (5t-gas-13s-ss--no ducts) · 123 m away
- 10208 Wolftrap DrAug 13, 2025Replace 150-amp main breaker panel · 132 m away
- 3912 Sawmill DrAug 12, 2024Replacing meter can (200amp) per austin energy (underground) · 158 m away
- 10209 Salida DrSep 22, 2026Pool- new in-ground gunite swimming pool approx. 13x23 ft with attached 6x6 kickout spa · 159 m away
- 3704 Malone DrSep 13, 2024Replacement of an existing water heater · 159 m away
- 3701 W Slaughter LnNov 5, 2025We are adding 4 interior walls to 3 existing office spaces. two current offices will be split in half and the 3rd will have two walls added to make a closed office. the affected offices will be vacant during the project · 166 m away