4506 Manzanillo Dr
Austin, TX 78749
4506 Manzanillo Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 4506 Manzanillo Dr, Austin, TX 78749. The most recent, filed November 15, 2023, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 15, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 15, 2023
- since Nov 15, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 14, 2023
- IssuedNov 15, 2023
- WorkNov '23 – Jan '24
- Final inspectionJan 9, 2024
Passed final inspection Jan 9, 2024.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-147341 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4506 Manzanillo Dr
What is being built at 4506 Manzanillo Dr?
The latest filing (City of Austin permit 2023-147341 MP, November 15, 2023) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 4506 Manzanillo Dr have?
1 filing across 1 project, from November 15, 2023 to November 15, 2023.
Is there other construction near 4506 Manzanillo Dr?
Yes. Nearby filings include 4504 Manzanillo Dr (replacement of complete existing central heat and air system with or without duct work, Jul 2, 2025); 4510 Manzanillo Dr (express: existing foundation repair as per scope of work attached, Dec 12, 2024); 7914 Copano Dr (uninstall 9 existing windows and replace with 9 new windows of same size: like for like install, Jun 20, 2025).
How do I get alerts for new permits at 4506 Manzanillo Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 4504 Manzanillo DrJul 2, 2025Replacement of complete existing central heat and air system with or without duct work · 14 m away
- 4510 Manzanillo DrDec 12, 2024Express: existing foundation repair as per scope of work attached · 31 m away
- 7914 Copano DrJun 20, 2025Uninstall 9 existing windows and replace with 9 new windows of same size: like for like install · 41 m away
- 4502 Manzanillo DrJun 24, 2024Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 4512 Manzanillo DrJan 22, 2025Replacement of complete existing central heat and air system with or without duct work · 47 m away
- 4406 Manzanillo DrSep 11, 2025Replacement of an existing water heater change out: install/replace 50 gallon natural gas water heater. tank to tank replacement · 72 m away
- 4516 Manzanillo DrMay 4, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system · 75 m away
- 8000 Copano DrSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 82 m away
- 8002 Copano DrNov 12, 2025Replace/upgrade main service · 95 m away
- 4505 San Simeon DrApr 8, 2024Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 4600 Manzanillo DrApr 19, 2024Replacement of an existing water heater · 125 m away
- 4405 Manzanillo DrDec 12, 2023Request to disconnect for the installation of roof mounted solar panels and solar batteries. new pv system updated to 5.14 kw dc. 13 canadian solar cs3n-395ms blk (395w) modules and 13 enphase iq8plus-72-2-us (240v) microinverters. new ess system updated to 02 franklinwh apower x ac-coupled battery energy storage unit(apr-05k13v1-us)[240v][si1-sb] (lithium iron phosphate) 13.6kwh and 01 franklinwh agate x transfer switch [crd-pcs-nem] · 127 m away