groundranger
Recent · latest filing Jan 2026Residential

4701 White Elm Dr

Austin, TX 78749

Permits cover EV charging circuit and home electrical work

A circuit for an electric vehicle charging station was permitted at this residence on January 19, 2026, under Austin permit 2026-005038 EP; its status is final. Earlier permits in 2024 covered a generator and transfer switch, a gas line for the generator, and a water heater replacement. The water heater permit, 2024-030093 PP, is listed as expired.

Summarized from City of Austin records · updated Jan 19, 2026

Projects
4
4 filings
Latest filing
Jan 19, 2026
since Jan 30, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

(douglass bill) - installation of circuit for elec. vehicle charging station - esip)

  1. AppliedJan 14, 2026
  2. IssuedJan 19, 2026
  3. WorkJan '26 – Jul '26
  4. Final inspectionJan 22, 2026

Passed final inspection Jan 22, 2026.

1 contact on this project

Permit & project history

4 projects
  1. (douglass bill) - installation of circuit for elec. vehicle charging station - esip)

    (douglass bill) - installation of circuit for elec. vehicle charging station - esip)

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Install generator and transfer switch. request spot

    Install generator and transfer switch. request spot

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Gas line for generator installation

    Gas line for generator installation

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 4701 White Elm Dr

What is being built at 4701 White Elm Dr in Austin?

The permits show home electrical and plumbing work, not a new building. The latest record covers a circuit for an electric vehicle charging station, permitted January 19, 2026.

Is an EV charging station being installed at 4701 White Elm Dr?

Austin permit 2026-005038 EP describes installation of a circuit for an electric vehicle charging station. The permit is dated January 19, 2026, and its status is final.

What is the latest permit for 4701 White Elm Dr?

The latest listed permit is 2026-005038 EP, dated January 19, 2026. It covers installation of a circuit for an electric vehicle charging station.

Was a generator installed at 4701 White Elm Dr?

Permits dated January 30 and February 22, 2024, cover a gas line for a generator and installation of a generator and transfer switch. Both permits are listed as final.

Is there a permit for a water heater at 4701 White Elm Dr?

Yes. Permit 2024-030093 PP, dated March 14, 2024, describes replacement of an existing water heater and is listed as expired.

Is a new home being built at 4701 White Elm Dr?

The listed Austin permits describe work at a residence, including an EV charging circuit, generator-related work, and a water heater replacement. They do not describe construction of a new home.

Also being built nearby

All of 78749
Email me when a new permit is filed