4825 Norman Trl
Austin, TX 78749
4825 Norman Trl: 1 project on record
City of Austin lists 1 filing across 1 project at 4825 Norman Trl, Austin, TX 78749. The most recent, filed June 4, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Jun 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2024
- since Jun 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing water heater
- AppliedMay 13, 2024
- IssuedJun 4, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 11, 2024
Passed final inspection Jul 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-059785 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4825 Norman Trl
What is being built at 4825 Norman Trl?
The latest filing (City of Austin permit 2024-059785 PP, June 4, 2024) covers replacement of an existing water heater.
How many permits and filings does 4825 Norman Trl have?
1 filing across 1 project, from June 4, 2024 to June 4, 2024.
Is there other construction near 4825 Norman Trl?
Yes. Nearby filings include 4828 Norman Trl (replacement of complete existing central heat and air system with or without duct work, Mar 4, 2025); 4900 Norman Trl (express: replace tub to shower; replace valve with new shower valve, May 7, 2026); 4909 Norman Trl (water yard line roughly 70ft, Dec 19, 2025).
How do I get alerts for new permits at 4825 Norman Trl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78749- 4828 Norman TrlMar 4, 2025Replacement of complete existing central heat and air system with or without duct work · 38 m away
- 4900 Norman TrlMay 7, 2026Express: replace tub to shower; replace valve with new shower valve · 53 m away
- 4909 Norman TrlDec 19, 2025Water yard line roughly 70ft · 68 m away
- 4921 Norman TrlDec 16, 2024Installation of a 11.34kw solar system with (28) 405w panels · 132 m away
- 4816 Chesney Ridge DrFeb 13, 2025Replacement of complete existing central heat and air system with or without duct work · 150 m away
- 4728 Norman TrlJul 27, 2026Replacement of complete existing central heat and air system with or without duct work · 178 m away
- 4804 Chesney Ridge DrJan 24, 2026Install car charger · 192 m away
- 4732 Tello PathApr 3, 202450g gas water heater replacement · 206 m away
- 4712 Cockrell CtMar 21, 2025Replacement of an existing water heater standard 50 gal natural gas · 230 m away
- 4701 Chesney Ridge DrMar 22, 2024Replacement of complete existing central heat and air system with or without duct work · 248 m away
- 4629 Chesney Ridge DrOct 2, 2024Installation of a 60a charger with #6 wire and 60a breaker to be installed on a load management device so as to not add a load to the 125a service · 266 m away
- 4700 Cockrell CtMay 2, 2025Replacement of complete existing central heat and air system with or without duct work · 280 m away