5008 Desert Oak Cir
Austin, TX 78749
EV charger and battery work at 5008 Desert Oak Cir
Austin permits cover electrical upgrades at 5008 Desert Oak Cir, including a Level 2 EV charger and a backup battery system with an additional meter socket. The latest permit was filed November 10, 2026; earlier permits from February and March 2025 cover slab-foundation repair.
Summarized from City of Austin records · updated Nov 10, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Nov 10, 2026
- since Feb 7, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInstall level 2 ev charger
- AppliedNov 6, 2026
- IssuedNov 10, 2026
- WorkNov '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
5 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitActive- Record
- 2026-146891 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Base: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitActive- Record
- 2026-101816 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
200 amp service upgrade
200 amp service upgrade
City of Austin permitElectrical PermitFinal- Record
- 2025-086149 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair on a slab foundation. we intend to install 12 total press piling pier locations along the perimeter. we will improve level to the extent. revision-plumbing work
Express: foundation repair on a slab foundation. we intend to install 12 total press piling pier locations along the perimeter. we will improve level to the extent. revision-plumbing work
City of Austin permitPlumbing PermitFinal- Record
- 2025-024533 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair on a slab foundation. we intend to install 12 total press piling pier locations along the perimeter. we will improve level to the extent
Express: foundation repair on a slab foundation. we intend to install 12 total press piling pier locations along the perimeter. we will improve level to the extent
City of Austin permitBuilding PermitFinal- Record
- 2025-011745 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5008 Desert Oak Cir
What is happening at 5008 Desert Oak Cir?
Austin permits document installation of a Level 2 EV charger and a backup battery system with an additional meter socket. Earlier permits cover foundation repair.
Is an EV charger being installed at 5008 Desert Oak Cir?
Yes. Austin electrical permit 2026-146891 EP, filed November 10, 2026, is for a Level 2 EV charger and is listed as active.
Is a home battery being installed at 5008 Desert Oak Cir?
An active electrical permit filed August 18, 2026, covers a backup battery system and an additional meter socket. The permit number is 2026-101816 EP.
Was foundation work permitted at 5008 Desert Oak Cir?
Yes. Building permit 2025-011745 BP, filed February 7, 2025, covers slab-foundation repair with 12 press-piling locations along the perimeter. A related plumbing permit was filed March 3, 2025.
Is a new house being built at 5008 Desert Oak Cir?
The records provided do not show a new-house permit. They document foundation repair and electrical work at the address.
Also being built nearby
All of 78749- 5006 Desert Oak CirNov 21, 2024Express: window replacement (two windows like for like) · 25 m away
- 5005 Desert Oak CirJan 8, 2024Replace outdoor main electrical panel and meter can · 60 m away
- 5013 Desert Oak CirOct 5, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 5000 Desert Oak CirJun 24, 2026Express- foundation repair on a slab foundation. install 16 total press piling pier locations along the perimeter. 5 breakthrough and patched locations. improve level · 97 m away
- 5001 Desert Oak CirJan 8, 2024Replace outdoor main electrical panel and meter can · 100 m away
- 7216 Wheeler Branch TrlJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 7208 Squirrel Oak CirJun 24, 2024Upgrade of existing underground service to 200 amp 120/240 volt single phase · 134 m away
- 5103 Wagon Hitch CvSep 28, 2026Express- foundation repair on a slab foundation. install 6 total press piling pier locations along perimeter. there will be 0 breakthrough and patched locations. improve level · 164 m away
- 7207 Squirrel Oak CirFeb 2, 2024*partial demolition* of existing deck addition of 582 sq ft covered porch to rear of existing sfr · 180 m away
- 7210 Wheeler Branch TrlNov 19, 2025Replacement of complete existing central heat and air system with or without duct work · 185 m away
- 7200 Squirrel Oak CirMay 9, 2026Express- remove and replace 10 windows and 2 entry doors like for like no structural changes · 196 m away
- 5105 Wagon Hitch CvDec 31, 2024Replacement of an existing water heater 50gal gas water heater changeout in a utility closet · 197 m away