5017 W US 290 Hwy Eb
Austin, TX 78749
Permits cover checkout-area changes and retail building repairs
City of Austin permits show work to existing retail space at 5017 W US 290 Hwy Eb, including a checkout-area reconfiguration permitted on December 23, 2025. Additional permits cover electrical, mechanical and plumbing work, a rooftop unit replacement, and a roof reskin; the latest listed permit was filed June 29, 2026.
Summarized from City of Austin records · updated Jun 29, 2026
- Projects
- 13
- 13 filings
- Latest filing
- Jun 29, 2026
- since May 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTear off existing tpo and reskin with new 60 mil tpo
- AppliedJun 22, 2026
- IssuedJun 29, 2026
- WorkJun '26 – Oct '26
- Final inspectionOct 28, 2026
Passed final inspection Oct 28, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
13 projectsTear off existing tpo and reskin with new 60 mil tpo
Tear off existing tpo and reskin with new 60 mil tpo
City of Austin permitBuilding PermitFinal- Record
- 2026-079302 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior alteration including reconfiguration of existing check out area
Interior alteration including reconfiguration of existing check out area
City of Austin permitPlumbing PermitFinal- Record
- 2025-113182 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior alteration including reconfiguration of existing check out area
Interior alteration including reconfiguration of existing check out area
City of Austin permitElectrical PermitFinal- Record
- 2025-113182 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior alteration including reconfiguration of existing check out area
Interior alteration including reconfiguration of existing check out area
City of Austin permitMechanical PermitFinal- Record
- 2025-113182 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior alteration including reconfiguration of existing check out area
Interior alteration including reconfiguration of existing check out area
City of Austin permitBuilding PermitFinal- Record
- 2025-113182 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install the cutler hammer fd3150 circuit breaker and twin bus hardware kit into panel ha2-2. mount the 75 kvar capacitor across the room on the wall and above the 45 kva transformer. furnish install and connect (1)1-1/2 raceway with three 1/0 phase wires and one #6 ground wire. use existing wireway as much as practical. label the circuit breaker and capacitor. record measurements before and after on capacitor measurement sheet. energize the capacitor measure and record the amperage on each phase
Install the cutler hammer fd3150 circuit breaker and twin bus hardware kit into panel ha2-2. mount the 75 kvar capacitor across the room on the wall and above the 45 kva transformer. furnish install and connect (1)1-1/2 raceway with three 1/0 phase wires and one #6 ground wire. use existing wireway as much as practical. label the circuit breaker and capacitor. record measurements before and after on capacitor measurement sheet. energize the capacitor measure and record the amperage on each phase
City of Austin permitElectrical PermitFinal- Record
- 2025-103501 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rtu replacement for existing retail
Rtu replacement for existing retail
City of Austin permitBuilding PermitFinal- Record
- 2024-049297 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installing of new doors to existing retail building
Installing of new doors to existing retail building
City of Austin permitBuilding PermitFinal- Record
- 2024-135236 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
City of Austin permitElectrical PermitFinal- Record
- 2024-052526 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
City of Austin permitMechanical PermitFinal- Record
- 2024-052526 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
Batten strip and seal bakery freezer (b1) replace bakery freezer evaporator coils (b1) replace bakery freezer doors (b1)
City of Austin permitBuilding PermitFinal- Record
- 2024-052526 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rtu replacement for existing retail
Rtu replacement for existing retail
City of Austin permitMechanical PermitFinal- Record
- 2024-049297 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Rtu replacement for existing retail
Rtu replacement for existing retail
City of Austin permitElectrical PermitFinal- Record
- 2024-049297 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5017 W US 290 Hwy Eb
What is being built at 5017 W US 290 Hwy Eb?
City of Austin permits describe alterations and repairs to existing retail space, including a reconfigured checkout area and roof work. They do not identify a new building or tenant.
Is the checkout area being renovated at 5017 W US 290?
Yes. A building permit filed December 23, 2025, covers an interior alteration that includes reconfiguring the existing checkout area. Related electrical, mechanical and plumbing permits were filed in January 2026.
What roof work is planned at 5017 W US 290 Hwy Eb?
A City of Austin permit filed June 29, 2026, describes removing the existing TPO roof and installing a new 60-mil TPO roof. The permit status is listed as Final.
Are there permits for HVAC work at 5017 W US 290?
Yes. A permit filed June 16, 2025, covers replacing a rooftop unit for existing retail space. Its status is listed as Final.
What electrical work is permitted at 5017 W US 290 Hwy Eb?
An electrical permit filed August 19, 2025, describes installing a circuit breaker and capacitor, along with associated wiring. Its status is listed as Final.