groundranger
Historic · latest filing Jul 2024Commercial

5401 Mc Carty Ln

Austin, TX 78749

Generator equipment upgrades at Austin Fire Station #27

Permits indicate generator equipment upgrades at the existing fire station at 5401 Mc Carty Ln, including a replacement automatic transfer switch, docking-station flatwork and a new concrete equipment pad. The building permit was filed June 14, 2024, and the electrical permit was filed July 11, 2024; both are listed as final.

Summarized from City of Austin records · updated Jul 11, 2024

Projects
4
4 filings
Latest filing
Jul 11, 2024
since Mar 2, 2007
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace an existing optional standby generator automatic transfer switch and a docking station flatwork and install a new concrete equipment pad for the generator for the existing fire station

  1. AppliedMay 31, 2024
  2. IssuedJul 11, 2024
  3. WorkJul '24 – Feb '25
  4. Final inspectionFeb 6, 2025

Passed final inspection Feb 6, 2025.

1 contact on this project · 1 phone number

Permit & project history

4 projects
  1. Replace an existing optional standby generator automatic transfer switch and a docking station flatwork and install a new concrete equipment pad for the generator for the existing fire station

    Replace an existing optional standby generator automatic transfer switch and a docking station flatwork and install a new concrete equipment pad for the generator for the existing fire station

    City of Austin permitElectrical PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace an existing optional standby generator automatic transfer switch and a docking station flatwork and install a new concrete equipment pad for the generator for the existing fire station

    Replace an existing optional standby generator automatic transfer switch and a docking station flatwork and install a new concrete equipment pad for the generator for the existing fire station

    City of Austin permitBuilding PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Fire Station #27

    Fire station #27

    City of Austin casesite_planApproved and Released
    Record
    11776543
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. E.M.S. ADDITION TO FIRE STATION #27

    E.m.s. addition to fire station #27

    City of Austin casesite_planApproved and Released
    Record
    145413
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5401 Mc Carty Ln

What is happening at 5401 Mc Carty Ln in Austin?

Permits describe work at an existing fire station: replacing the generator’s automatic transfer switch, adding docking-station flatwork and installing a concrete equipment pad. The 2024 building and electrical permits are listed as final.

Is a new fire station being built at 5401 Mc Carty Ln?

The permit descriptions refer to the existing fire station, not a new station. The work is for generator equipment and related concrete work.

What was permitted at 5401 Mc Carty Ln in 2024?

A building permit, 2024-074673 BP, was filed June 14, 2024, and an electrical permit, 2024-074673 EP, was filed July 11, 2024. Both cover generator equipment work at the existing fire station and are listed as final.

Is Fire Station #27 at 5401 Mc Carty Ln getting generator upgrades?

Yes. The permits describe replacing an automatic transfer switch and installing a new concrete equipment pad for the generator, along with docking-station flatwork.

What is the status of the work at 5401 Mc Carty Ln?

The City of Austin lists both 2024 permits—2024-074673 BP and 2024-074673 EP—as final.

Was there an earlier project at Fire Station #27?

A City of Austin site-plan case for an EMS addition to Fire Station #27 was approved and released on March 2, 2007. A separate site-plan case named Fire Station #27 was approved and released on January 21, 2022.

Also being built nearby

All of 78749
Email me when a new permit is filed