groundranger
Active · latest filing Nov 2026Residential

5808 Fitchwood Ln

Austin, TX 78749

5808 Fitchwood Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 5808 Fitchwood Ln, Austin, TX 78749. The most recent, filed November 16, 2026, covers: “Emergency - request to disconnect and reconnect. trutec will be replacing meter can that had a burnt up hot wire and lug. trutec will also be bringing rest of system up to code”.

Compiled from City of Austin records · updated Nov 16, 2026

Projects
1
1 filings
Latest filing
Nov 16, 2026
since Nov 16, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Emergency - request to disconnect and reconnect. trutec will be replacing meter can that had a burnt up hot wire and lug. trutec will also be bringing rest of system up to code

  1. AppliedNov 12, 2026
  2. IssuedNov 16, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
2% through of the permit windowNov 16, 2026 → May 15, 2027

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Emergency - request to disconnect and reconnect. trutec will be replacing meter can that had a burnt up hot wire and lug. trutec will also be bringing rest of system up to code

    Emergency - request to disconnect and reconnect. trutec will be replacing meter can that had a burnt up hot wire and lug. trutec will also be bringing rest of system up to code

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 5808 Fitchwood Ln

What is being built at 5808 Fitchwood Ln?

The latest filing (City of Austin permit 2026-148819 EP, November 16, 2026) covers emergency - request to disconnect and reconnect. trutec will be replacing meter can that had a burnt up hot wire and lug. trutec will also be bringing rest of system up to code.

How many permits and filings does 5808 Fitchwood Ln have?

1 filing across 1 project, from November 16, 2026 to November 16, 2026.

Is there other construction near 5808 Fitchwood Ln?

Yes. Nearby filings include 5807 Fitchwood Ln (replacement of complete existing central heat and air system with or without duct work located in hallway closet, Nov 10, 2025); 5811 Fitchwood Ln (replacement of complete existing central heat and air system with or without duct work replacement of hvac system, Jun 23, 2026); 5802 Fitchwood Ln (install level 2 ev charger, Jul 6, 2026).

How do I get alerts for new permits at 5808 Fitchwood Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78749
Email me when it passes final inspection