Backup battery and meter socket permitted at 6212 Smith Oak Trl
An electrical permit indicates installation of a backup battery system and an additional meter socket at 6212 Smith Oak Trl in Austin. The City of Austin permit, 2026-117843 EP, was filed September 18, 2026, and is marked final.
Summarized from City of Austin records · updated Sep 18, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 18, 2026
- since Sep 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBase: installing a backup battery system and additional meter socket
- AppliedSep 8, 2026
- IssuedSep 18, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 21, 2026
Passed final inspection Oct 21, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectBase: installing a backup battery system and additional meter socket
Base: installing a backup battery system and additional meter socket
City of Austin permitElectrical PermitFinal- Record
- 2026-117843 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6212 Smith Oak Trl
What work is permitted at 6212 Smith Oak Trl?
The permit describes installing a backup battery system and an additional meter socket. It is an electrical permit, not a record of a new building.
Is a backup battery being installed at 6212 Smith Oak Trl in Austin?
Yes. City of Austin permit 2026-117843 EP lists installation of a backup battery system and an additional meter socket.
When was the electrical permit filed for 6212 Smith Oak Trl?
The permit was filed September 18, 2026.
Is the permit for 6212 Smith Oak Trl final?
Yes. The City of Austin record lists permit 2026-117843 EP as final.
Is new construction planned at 6212 Smith Oak Trl?
The available record is for electrical work to install a backup battery system and an additional meter socket. It does not describe a new building.
Also being built nearby
All of 78749- 5302 Wolf RunSep 22, 2026Excavate roughly 30 feet to expose/redo water line from the meter to the home bed in new line per code use tracing wire as well as install new shut off valve/prv and access box * replacement of the existing water heater with a new [50-gal gas tank] water heater in the same location like-for-like including [new t&p discharge expansion tank drain pan and flex connectors] per code · 30 m away
- 5305 Honey Dew TerJan 18, 2024Install new 7.56kw rooftop solar system and 13.5kw energy storage system for existing residential only · 52 m away
- 6301 Smith Oak TrlMay 26, 2026Replacement of complete existing central heat and air system with or without duct work replacing like for like 3t vertical gas system · 61 m away
- 5305 Wolf RunJul 24, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage horizontal gas system · 71 m away
- 6204 Morning Dew DrSep 17, 2024Tunneling to repair the pvc break located under the master bathroom · 111 m away
- 5403 Wolf RunJun 9, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3.5 ton 14 seer2 single stage york condenser evap coil and gas furnace · 128 m away
- 6304 Morning Dew DrNov 20, 2025Request to disconnect install new 150 amp load center with 150 amp main on existing 150 amp meter can per ec: no meter work will be done · 138 m away
- 5305 Badger BndOct 15, 2026Replace existing electrical service equipment with new 200a meter base service mast leviton main panel grounding/bonding and whole-home surge protection. replace existing subpanel with new 60a leviton panel and install leviton network kits in both panels · 143 m away
- 6309 Smith Oak TrlApr 24, 2026Repair 22 belly located under the slab · 157 m away
- 5309 Badger BndJan 22, 2025Express: replace 10 windows · 157 m away
- 5311 Badger BndJan 28, 2026Express- replace 2 windows like for like · 158 m away
- 6201 Honey Dew CtMar 11, 2025Remove existing overhead meter point of attachment and main outdoor panel then replace them with new point of attachment mast 200-amp overhead meter 200-amp mcb panel new ground rods whole house surge suppressor and intersystem bonding device · 159 m away