6300 W William Cannon Dr
Austin, TX 78749
Plumbing permit covers sewer repairs at Cook-Walden Funeral Home
A City of Austin plumbing permit filed January 23, 2025, covers a 300-foot tunnel under the slab with four access holes, concrete breakout and a 110-foot sewer line repair at Cook-Walden Funeral Home and Memorial Park. The permit, 2025-006663 PP, is marked final.
Summarized from City of Austin records · updated Jan 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 23, 2025
- since Jan 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCook walden funeral home and memorial park. 300ft tunnel under slab with 4 access holes and concrete break out and 110ft sewer line repair
- AppliedJan 17, 2025
- IssuedJan 23, 2025
- WorkJan '25 – Apr '25
- Final inspectionApr 25, 2025
Passed final inspection Apr 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectCook walden funeral home and memorial park. 300ft tunnel under slab with 4 access holes and concrete break out and 110ft sewer line repair
Cook walden funeral home and memorial park. 300ft tunnel under slab with 4 access holes and concrete break out and 110ft sewer line repair
City of Austin permitPlumbing PermitFinal- Record
- 2025-006663 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 6300 W William Cannon Dr
What is being built at 6300 W William Cannon Dr?
The January 23, 2025, permit describes plumbing work at Cook-Walden Funeral Home and Memorial Park: a tunnel under the slab, four access holes, concrete breakout and a sewer line repair.
What is permit 2025-006663 PP for?
It is a City of Austin plumbing permit for a 300-foot tunnel under the slab and a 110-foot sewer line repair at 6300 W William Cannon Dr.
When was the plumbing permit filed at 6300 W William Cannon Dr?
The permit was filed January 23, 2025, and is marked final.
Is a new funeral home being built at 6300 W William Cannon Dr?
The permit record describes tunnel and sewer repair work at Cook-Walden Funeral Home and Memorial Park; it does not describe a new building.
How long is the sewer line repair at Cook-Walden Funeral Home?
The permit description specifies a 110-foot sewer line repair, along with a 300-foot tunnel under the slab.
Also being built nearby
All of 78749- 6300 William Cannon DrMay 7, 2008Sci/cook-walden forest oaks
- 6306 William Cannon DrSep 10, 2019William cannon retail with r sp-2017-0189c · 105 m away
- 6509 US 290 HwyJul 31, 2007G.k. beckett estate commercial redevelopment · 167 m away
- 6705 US 290 HwySep 15, 2015Detour bar & grill · 202 m away
- 6200 William Cannon DrMar 17, 2009High mesa plaza ii, resubdivision of lot 1 block 1 — high mesa plaza ii, resubdivision of lot 1 block 1 · 208 m away
- 6501 US 290 HwyOct 18, 2010Mccarty oaks revision · 220 m away
- 6803 Kenosha PassMar 6, 2026Replacement of an existing water heater tankless water heater replacement 6803 kenosha pass austin tx 78749 · 231 m away
- 6114 William Cannon DrFeb 9, 2009High mesa plaza sec ii, amended plat of lots 2 &3 block i — high mesa plaza section ii amended plat of lots 2 &3 block i · 252 m away
- 6211 William Cannon DrMar 2, 2007High mesa plaza · 264 m away
- 6304 Latigo PassJan 23, 2025Replacement of an existing water heater · 272 m away
- 6412 W US 290 HwyApr 6, 2026New canopy fascia and logo east elevation · 297 m away
- 6406 Wolfcreek PassNov 21, 2024Need to schedule outage to upgrade from a single 200 a meter to a 320a meter on main house need to disconnect power remove existing meter and rebuild a new meter loop meter loop to serve existing house and new adu adu permit number 2024-089385 ep · 299 m away